Maciej Malinowski - Science profile - Bridge of Knowledge

Search

Business contact

Centrum Transferu Wiedzy i Technologii
Location
Al. Zwycięstwa 27, 80-219 Gdańsk
Phone
+48 58 348 62 62
E-mail
biznes@pg.edu.pl

Social media

Publication showcase

  • Original footbridge in Mikolajki, Poland

    In summer 2016, a new footbridge in the town of Mikołajki (Poland) was built, over a stream connecting two adjacent lakes – Talty and Mikołajki. Its modern construction, based on the shape of a DN ice-boat, makes it inique in Poland, and probably in the world as well. This novel and dynamic shape became a significant landmark associated not only with Mikołajki, but also with the whole region of Mazury, as well as with sailing...

  • A 95-Year-Old Concrete Arch Bridge: From Materials Characterization to Structural Analysis

    The structural analysis of a 95-year-old concrete arch bridge located in Jagodnik (Poland) is performed in this paper, in order to check its behavior under today’s traffic loads. The mechanical properties of both the concrete and the reinforcement are investigated by testing cores and bar stubs extracted from the bridge. Structural analysis confirms that the bridge meets today’s load requirements in terms of bearing capacity, serviceability...

    Full text available to download

  • Zur Wiedergeburt einer historischen Gitterbrucke

    Mit Blick auf die komplizierte Geschichte der 160 Jahre alten schmiedeeisernen Gitterbrücke in Tczew (deutsch: Dirschau) über die Weichsel und in Bezug auf die Ideen ihrer Ertüchtigung wird im folgenden Beitrag die Untersuchung zur Probebelastung der originalen Felder des Überbaus beschrieben. Der historische Überbau der Weichselbrücke Dirschau wird dabei mit einer neuen Fahrbahn belastet. Es konnte die erforderliche Tragfähigkeit...

    Full text to download in external service

seen 6613 times