Complex modulus of Cement Bitumen Treated Material Mixture C3E4 cores obtained from the field section (28-365 days of curing at the field and later in laboratory at 20C) - Open Research Data - Bridge of Knowledge

Search

Complex modulus of Cement Bitumen Treated Material Mixture C3E4 cores obtained from the field section (28-365 days of curing at the field and later in laboratory at 20C)

Description

Dataset presents data of complex modulus determined for cold recycled mixture – cement bitumen treated material mixture with following binding agents: 3% cement, 4% emulsion (C3E4). Mixture was designed according to Polish requirements for the base course of pavement. Specimen were obtained from the field at 28, 180, 270 and 365 days after compaction. Mixture contains 70% of RAP material. Specimen size: f=100 mm, h=150mm. 

Data was obtained on the Simple Performance Tester (IPC global) for 1 temperatures (+20°C) and varied curing times (28, 42, 90, 180, 270 and 365 days - see description in the dataset). Gauge length was 70 mm.

Test load was selected as haversine compression with varied target strain range – from 10-20µstrain up to 200-210µstrain.

Dataset file

Linearity check - Complex Modulus (SPT) - Cores obtained from the field (Argentum).xlsx
54.3 kB, S3 ETag f34c9a4e80081594d400ff3685fd8344-1, downloads: 47
The file hash is calculated from the formula
hexmd5(md5(part1)+md5(part2)+...)-{parts_count} where a single part of the file is 512 MB in size.

Example script for calculation:
https://github.com/antespi/s3md5

File details

License:
Creative Commons: by-nc 4.0 open in new tab
CC BY-NC
Non-commercial

Details

Year of publication:
2024
Verification date:
2024-01-19
Dataset language:
English
Fields of science:
  • civil engineering, geodesy and transport (Engineering and Technology)
DOI:
DOI ID 10.34808/p6ph-mx41 open in new tab
Series:
Verified by:
Gdańsk University of Technology

Keywords

References

Cite as

seen 98 times