Abstract
This article presents basic dependences for conducting a technical and economic analysis related with investment projects. It describes a combined system of a compression ignition engine and a steam turbine, whose aim, when placed on a floating platform, is to generate electric energy in the so-called distributed generation system. Such a system involves a reciprocating internal combustion engine and a connected steam turbine system that uses the energy contained in the exhaust gas of the combustion engine. Assumptions and restrictions, as well as results of calculations are given in the article. Calculations were conducted only in view of investment and operational costs. The parameters of Wartsila and MAN Diesel & Turbo low-speed combustion engines of the capacity of approximately 54 MW were used for the analysis, and on the basis of them the cost of generating 1 MWh of electric energy was estimated..
Authors (2)
Cite as
Full text
- Publication version
- Accepted or Published Version
- License
- open in new tab
Keywords
Details
- Category:
- Articles
- Type:
- artykuły w czasopismach recenzowanych i innych wydawnictwach ciągłych
- Published in:
-
Journal of Polish CIMEEAC
no. 9,
pages 103 - 110,
ISSN: 1231-3998 - Language:
- English
- Publication year:
- 2014
- Bibliographic description:
- Olszewski W., Dzida M.: ISSUES OF ECONOMIC ANALYSIS OF ELECTRIC ENERGY GENERATION IN A FLOATING POWER PLANT// Journal of Polish CIMAC. -Vol. 9., nr. 1 (2014), s.103-110
- Verified by:
- Gdańsk University of Technology
seen 110 times