Deflection measurement of field section with pavement with base course made of Cement Bitumen Treated Material Mixture C3E4 (28, 180, 270, 365 days after compaction) - Open Research Data - Bridge of Knowledge

Search

Deflection measurement of field section with pavement with base course made of Cement Bitumen Treated Material Mixture C3E4 (28, 180, 270, 365 days after compaction)

Description

Dataset presents data of deflections determined for pavement with base course made of cold recycled mixture – cement bitumen treated material mixture with following binding agents: 3% cement, 4% emulsion (C3E4). Mixture was designed according to Polish requirements for the base course of pavement. Mixture was mixed in stationary plant and compacted in field conditions using steel and rubber rollers. In two first measurements pavement consisted only from the CBTM course (20 cm). In two second measurements pavement had full structure (10 cm of Asphalt concrete and 20 cm of CBTM base course). Mixture contains around 70% of RAP material. 

Data was obtained using FFWD equipment (Dynatest) for 4 times after compation (28, 180, 270 and 365 days). Measurements were made by external contractor.

Test load was selected as dynamic impact load of 50 kN and contact pressure of 710 kPa.

Dataset file

FWD - field section (Argentum).xlsx
12.6 kB, S3 ETag 3e891de8ba3dad9d36ae116eb48fd882-1, downloads: 48
The file hash is calculated from the formula
hexmd5(md5(part1)+md5(part2)+...)-{parts_count} where a single part of the file is 512 MB in size.

Example script for calculation:
https://github.com/antespi/s3md5

File details

License:
Creative Commons: by-nc 4.0 open in new tab
CC BY-NC
Non-commercial

Details

Year of publication:
2024
Verification date:
2024-07-05
Dataset language:
English
Fields of science:
  • civil engineering, geodesy and transport (Engineering and Technology)
DOI:
DOI ID 10.34808/4ebs-1w17 open in new tab
Series:
Verified by:
Gdańsk University of Technology

Keywords

Cite as

seen 99 times