Design of Inner Gate for CRIST Shipyard Dry Dock - Publication - Bridge of Knowledge

Search

Design of Inner Gate for CRIST Shipyard Dry Dock

Abstract

The paper deals with a removable steel inner gate which was designed to separate two parts of a dry dock of about 70 m in width and 380 m in length. The gate allows for independent assembly of ship structures in two separated parts of the dock. The fore part of the dock can be flooded while the after part is dry. Tthe gate was designed by IDEK Company Ltd in 2011 and it was soon constructed and used by CRIST Shipyard in Gdynia.

Citations

  • 0

    CrossRef

  • 0

    Web of Science

  • 0

    Scopus

Keywords

Details

Category:
Articles
Type:
artykuł w czasopiśmie wyróżnionym w JCR
Published in:
Polish Maritime Research no. 19, pages 52 - 56,
ISSN: 1233-2585
Language:
English
Publication year:
2012
Bibliographic description:
Bogdaniuk M., Górecki Z.: Design of Inner Gate for CRIST Shipyard Dry Dock// Polish Maritime Research. -Vol. 19, iss. 1(72) (2012), s.52-56
DOI:
Digital Object Identifier (open in new tab) 10.2478/v10012-012-0007-5
Verified by:
Gdańsk University of Technology

seen 161 times

Recommended for you

Meta Tags