On the production of electricity in Poland using a geothermal binary power plant - A thermodynamic overview - Part I - Publication - Bridge of Knowledge

Search

On the production of electricity in Poland using a geothermal binary power plant - A thermodynamic overview - Part I

Abstract

Poland has a significant potential of geothermal energy. However, the high-temperature sources that are needed to drive power plants are found in relatively few places. Therefore, the objective of this paper is to consider any location in the northern part of Poland as a possible place to build a binary power plant. A scientific research was confirmed the existence of an elevated temperature gradient in this region. The hot rocks have an approximate temperature of 120 oC at depths of 3000 m. It was assumed that a hot brine emanates from these sources at a volume flow rate of 400m3/h and drives the Organic Rankine Cycle with isobutane as a working medium. The First Law thermal efficiency and the power output were estimated at 10.5% and 1.79 MWe, respectively. In addition, the Second Law thermal efficiency were calculated at 29.0%. All results were compared with the other binary power plants and they confirm that establishing the binary power plant in Poland would be thermodynamically justified.

Authors (5)

Cite as

Full text

full text is not available in portal

Keywords

Details

Category:
Conference activity
Type:
publikacja w wydawnictwie zbiorowym recenzowanym (także w materiałach konferencyjnych)
Language:
English
Publication year:
2019
Bibliographic description:
Badur J., Hyrzyński R., Lemański M. D., Ziółkowski P., Bykuć S.: On the production of electricity in Poland using a geothermal binary power plant - A thermodynamic overview - Part I// / : , 2019,
Verified by:
Gdańsk University of Technology

seen 128 times

Recommended for you

Meta Tags