Abstract
In the paper the quality fluctuations of leachate from municipal landfill in Gdansk (Poland) over the last 5 years and evaluation of a wetland system designed for treatment of the leachate are discussed.The research has been conducted during the 5 years period. The constructed wetland for leachate treatment, consisting of 2 horizontal subsurface flow reed beds, working in parallel was built in 2001. In the period 2005-06 it underwent modernization due to unsatisfactory treatment results caused by clogging of the beds. The treatment effectiveness after modernization is satisfactory. The effluent from bed I met Polish outflow standards, while in the effluent from bed II COD, total N and TSS exceeded the required concentrations. In spite of this, pre-treatment of leachate (iron removal) should be quickly introduced to protect the system against the repetition of clogging problems
Authors (3)
Cite as
Full text
full text is not available in portal
Keywords
Details
- Category:
- Articles
- Type:
- artykuły w czasopismach recenzowanych i innych wydawnictwach ciągłych
- Published in:
-
Journal of Ecological Engineering
pages 202 - 211,
ISSN: 2299-8993 - Language:
- English
- Publication year:
- 2011
- Bibliographic description:
- Obarska-Pempkowiak H., Gajewska M., Wojciechowska E.: Operational problems of constructed wetland for landfill leachates treatment: case study// Inżynieria Ekologiczna. -., nr. nr 25 (2011), s.202-211
- Verified by:
- Gdańsk University of Technology
seen 68 times
Recommended for you
Reliability and efficiency of pollution removal during long-term operation of a one-stage constructed wetland system with horizontal flow
- K. Jóźwiakowski,
- P. Bugajski,
- Z. Mucha
- + 7 authors