Pylon foundation of a cable stayed bridge at the motorway ring road of Wrocław - Publication - Bridge of Knowledge

Search

Pylon foundation of a cable stayed bridge at the motorway ring road of Wrocław

Abstract

The largest bridge of the motorway ring road of Wroclaw is a cable stayed bridge over the Odra river near Rędzin. Due to hydrogeological conditions of the ground it was not convenient to use standard bored piles of high length. Instead shorter piles were applied with additional improvement by cement injections at the pile toes. This decision was possible by extending ground investigation program and application of numerical modeling of the soil-structure interaction with nonstandard material models of the overconsolidated clayey deposits. Sufficient stiffness and bearing capacity of piles was approved by field tests. Overall performance of the foundation was monitored during construction and after completion of the bridge. Comparison of settlements predicted during design and obtained in the monitoring is presented and discussed.

Cite as

Full text

download paper
downloaded 71 times
Publication version
Accepted or Published Version
License
Copyright (Comité français de mécanique des sols et de géotechnique (CFSM))

Keywords

Details

Category:
Conference activity
Type:
publikacja w wydawnictwie zbiorowym recenzowanym (także w materiałach konferencyjnych)
Title of issue:
Proceedings of the 18th International Conference on Soil Mechanics and Geotechnical Engineering strony 2715 - 2718
Language:
English
Publication year:
2013
Bibliographic description:
Dembicki E., Cudny M., Krasiński A., Załęski K.: Pylon foundation of a cable stayed bridge at the motorway ring road of Wrocław// Proceedings of the 18th International Conference on Soil Mechanics and Geotechnical Engineering/ ed. Pierre Delage, Jacques Desrues, Roger Frank, Alain Puech, Francois Schlosser Paryż: , 2013, s.2715-2718
Verified by:
Gdańsk University of Technology

seen 218 times

Recommended for you

Meta Tags