Rebuilding Bailey Bridge to Bridge With Bascule Span – A Case Study - Publication - Bridge of Knowledge

Search

Rebuilding Bailey Bridge to Bridge With Bascule Span – A Case Study

Abstract

The structural analysis of a road foldable prefabricated steel Bailey- type bridge located over the Tuga River in Żelichowo, Poland is performed in this paper. Interesting and untypical bridge redevelopment performed made it possible to lift the middle foldable bridge span by approximately 4.0 m concerning the existing state. The paper begins with a survey of literature carried out on the investigations of foldable Bailey-type bridge subject matter. A description of the numerical modelling of foldable prefabricated bridges is performed. The comparison of the proof load test results with the FEM numerical model results has shown very good compatibility. This paper can provide scientists, engineers, and designers the basis for structural analysis in the field of foldable Bailey-type bridge constructions and numerical simulations.

Citations

  • 1

    CrossRef

  • 0

    Web of Science

  • 2

    Scopus

Keywords

Details

Category:
Articles
Type:
artykuły w czasopismach
Published in:
Baltic Journal of Road and Bridge Engineering no. 19, pages 136 - 161,
ISSN: 1822-427X
Language:
English
Publication year:
2024
Bibliographic description:
Ambroziak A., Malinowski M., Wałęga M.: REBUILDING BAILEY BRIDGE TO BRIDGE WITH BASCULE SPAN - CASE STUDY// Baltic Journal of Road and Bridge Engineering -Vol. 19,iss. 1 (2024), s.136-161
DOI:
Digital Object Identifier (open in new tab) 10.7250/bjrbe.2024-19.631
Sources of funding:
  • Free publication
Verified by:
Gdańsk University of Technology

seen 126 times

Recommended for you

Meta Tags