EHV transmission lines wires location on line operation issues - case studies - Publikacja - MOST Wiedzy

Wyszukiwarka

EHV transmission lines wires location on line operation issues - case studies

Abstrakt

Transmission lines towers construction affects the line parameters and influences on its operation in the future. Misguided design of the tower can lead to serious problems such as overvoltages, electric arc extinction difficulties, voltage asymmetry, resonance phenomena or increasing of magnetic field near the line. The paper points out those threats on example of 400 kV double circuit overhead transmission line with shunt reactors. The paper discuses the impact of circuits orientation of the transmission line, phase wires arrangement and line transpositions on above problems. The study includes steady state analyses and transient analyses (EMT simulations).

Cytowania

  • 4

    CrossRef

  • 0

    Web of Science

  • 4

    Scopus

Cytuj jako

Pełna treść

pełna treść publikacji nie jest dostępna w portalu

Słowa kluczowe

Informacje szczegółowe

Kategoria:
Aktywność konferencyjna
Typ:
materiały konferencyjne indeksowane w Web of Science
Tytuł wydania:
2015 IEEE Eindhoven PowerTech strony 1 - 6
Język:
angielski
Rok wydania:
2015
Opis bibliograficzny:
Klucznik J., Lubośny Z., Dobrzyński K., Czapp S..: EHV transmission lines wires location on line operation issues - case studies, W: 2015 IEEE Eindhoven PowerTech, 2015, ,.
DOI:
Cyfrowy identyfikator dokumentu elektronicznego (otwiera się w nowej karcie) 10.1109/ptc.2015.7232305
Weryfikacja:
Politechnika Gdańska

wyświetlono 125 razy

Publikacje, które mogą cię zainteresować

Meta Tagi