Pylon foundation of a cable stayed bridge at the motorway ring road of Wrocław

Abstrakt

The largest bridge of the motorway ring road of Wroclaw is a cable stayed bridge over the Odra river near Rędzin. Due to hydrogeological conditions of the ground it was not convenient to use standard bored piles of high length. Instead shorter piles were applied with additional improvement by cement injections at the pile toes. This decision was possible by extending ground investigation program and application of numerical modeling of the soil-structure interaction with nonstandard material models of the overconsolidated clayey deposits. Sufficient stiffness and bearing capacity of piles was approved by field tests. Overall performance of the foundation was monitored during construction and after completion of the bridge. Comparison of settlements predicted during design and obtained in the monitoring is presented and discussed.

Cytuj jako

Pełna treść

pobierz publikację
pobrano 71 razy
Wersja publikacji
Accepted albo Published Version
Licencja
Copyright (Comité français de mécanique des sols et de géotechnique (CFSM))

Słowa kluczowe

Informacje szczegółowe

Kategoria:
Aktywność konferencyjna
Typ:
publikacja w wydawnictwie zbiorowym recenzowanym (także w materiałach konferencyjnych)
Tytuł wydania:
Proceedings of the 18th International Conference on Soil Mechanics and Geotechnical Engineering strony 2715 - 2718
Język:
angielski
Rok wydania:
2013
Opis bibliograficzny:
Dembicki E., Cudny M., Krasiński A., Załęski K.: Pylon foundation of a cable stayed bridge at the motorway ring road of Wrocław// Proceedings of the 18th International Conference on Soil Mechanics and Geotechnical Engineering/ ed. Pierre Delage, Jacques Desrues, Roger Frank, Alain Puech, Francois Schlosser Paryż: , 2013, s.2715-2718
Weryfikacja:
Politechnika Gdańska

wyświetlono 218 razy

Publikacje, które mogą cię zainteresować

Meta Tagi