Rebuilding Bailey Bridge to Bridge With Bascule Span – A Case Study - Publikacja - MOST Wiedzy

Wyszukiwarka

Rebuilding Bailey Bridge to Bridge With Bascule Span – A Case Study

Abstrakt

The structural analysis of a road foldable prefabricated steel Bailey- type bridge located over the Tuga River in Żelichowo, Poland is performed in this paper. Interesting and untypical bridge redevelopment performed made it possible to lift the middle foldable bridge span by approximately 4.0 m concerning the existing state. The paper begins with a survey of literature carried out on the investigations of foldable Bailey-type bridge subject matter. A description of the numerical modelling of foldable prefabricated bridges is performed. The comparison of the proof load test results with the FEM numerical model results has shown very good compatibility. This paper can provide scientists, engineers, and designers the basis for structural analysis in the field of foldable Bailey-type bridge constructions and numerical simulations.

Cytowania

  • 1

    CrossRef

  • 0

    Web of Science

  • 2

    Scopus

Słowa kluczowe

Informacje szczegółowe

Kategoria:
Publikacja w czasopiśmie
Typ:
artykuły w czasopismach
Opublikowano w:
Baltic Journal of Road and Bridge Engineering nr 19, strony 136 - 161,
ISSN: 1822-427X
Język:
angielski
Rok wydania:
2024
Opis bibliograficzny:
Ambroziak A., Malinowski M., Wałęga M.: REBUILDING BAILEY BRIDGE TO BRIDGE WITH BASCULE SPAN - CASE STUDY// Baltic Journal of Road and Bridge Engineering -Vol. 19,iss. 1 (2024), s.136-161
DOI:
Cyfrowy identyfikator dokumentu elektronicznego (otwiera się w nowej karcie) 10.7250/bjrbe.2024-19.631
Źródła finansowania:
  • Publikacja bezkosztowa
Weryfikacja:
Politechnika Gdańska

wyświetlono 146 razy

Publikacje, które mogą cię zainteresować

Meta Tagi