EHV transmission lines wires location on line operation issues - case studies - Publication - Bridge of Knowledge

Search

EHV transmission lines wires location on line operation issues - case studies

Abstract

Transmission lines towers construction affects the line parameters and influences on its operation in the future. Misguided design of the tower can lead to serious problems such as overvoltages, electric arc extinction difficulties, voltage asymmetry, resonance phenomena or increasing of magnetic field near the line. The paper points out those threats on example of 400 kV double circuit overhead transmission line with shunt reactors. The paper discuses the impact of circuits orientation of the transmission line, phase wires arrangement and line transpositions on above problems. The study includes steady state analyses and transient analyses (EMT simulations).

Citations

  • 4

    CrossRef

  • 0

    Web of Science

  • 4

    Scopus

Cite as

Full text

full text is not available in portal

Keywords

Details

Category:
Conference activity
Type:
materiały konferencyjne indeksowane w Web of Science
Title of issue:
2015 IEEE Eindhoven PowerTech strony 1 - 6
Language:
English
Publication year:
2015
Bibliographic description:
Klucznik J., Lubośny Z., Dobrzyński K., Czapp S..: EHV transmission lines wires location on line operation issues - case studies, W: 2015 IEEE Eindhoven PowerTech, 2015, ,.
DOI:
Digital Object Identifier (open in new tab) 10.1109/ptc.2015.7232305
Verified by:
Gdańsk University of Technology