Best results in : Research Potential Pokaż wszystkie wyniki (1)
Search results for: incompatibility graph
-
Zespół Algorytmów i Modelowania Systemów
Research PotentialStudiowanie problemów i modeli teoriografowych ma na celu badanie złożoności obliczeniowej uogólnień problemu klasycznego kolorowania wierzchołków i krawędzi grafu znajdujących zastosowania w modelowaniu praktycznych problemów oraz badanie nowych miar oceny skuteczności algorytmów. W zakresie szeregowania zadań badania koncentrują się na konstrukcji harmonogramów optymalnych z punktu widzenia długości harmonogramu i średniego czasu...
Other results Pokaż wszystkie wyniki (11)
Search results for: incompatibility graph
-
Scheduling with Complete Multipartite Incompatibility Graph on Parallel Machines
PublicationIn this paper we consider a problem of job scheduling on parallel machines with a presence of incompatibilities between jobs. The incompatibility relation can be modeled as a complete multipartite graph in which each edge denotes a pair of jobs that cannot be scheduled on the same machine. Our research stems from the works of Bodlaender, Jansen, and Woeginger (1994) and Bodlaender and Jansen (1993). In particular, we pursue the...
-
Scheduling with Complete Multipartite Incompatibility Graph on Parallel Machines: Complexity and Algorithms
PublicationIn this paper, the problem of scheduling on parallel machines with a presence of incompatibilities between jobs is considered. The incompatibility relation can be modeled as a complete multipartite graph in which each edge denotes a pair of jobs that cannot be scheduled on the same machine. The paper provides several results concerning schedules, optimal or approximate with respect to the two most popular criteria of optimality:...
-
Scheduling on Uniform and Unrelated Machines with Bipartite Incompatibility Graphs
PublicationThe problem of scheduling jobs on parallel machines under an incompatibility relation is considered in this paper. In this model, a binary relation between jobs is given and no two jobs that are in the relation can be scheduled on the same machine. We consider job scheduling under the incompatibility relation modeled by a bipartite graph, under the makespan optimality criterion, on uniform and unrelated machines. Unrelated machines...
-
Scheduling of unit-length jobs with cubic incompatibility graphs on three uniform machines
PublicationWe consider the problem of scheduling n identical jobs on 3 uniform machines with speeds s1, s2, and s3 to minimize the schedule length. We assume that jobs are subject to some kind of mutual exclusion constraints, modeled by a cubic incompatibility graph. We how that if the graph is 2-chromatic then the problem can be solved in O(n^2) time. If the graph is 3-chromatic, the problem becomes NP-hard even if s1>s2=s3.
-
Scheduling of identical jobs with bipartite incompatibility graphs on uniform machines. Computational experiments
PublicationWe consider the problem of scheduling unit-length jobs on three or four uniform parallel machines to minimize the schedule length or total completion time. We assume that the jobs are subject to some types of mutual exclusion constraints, modeled by a bipartite graph of a bounded degree. The edges of the graph correspond to the pairs of jobs that cannot be processed on the same machine. Although the problem is generally NP-hard,...