Description
Fatigue data of Cement Bitumen Treated Material Mixture C3E5.5 (over 28 days of curing at 20C)
Dataset presents data of fatigue life determined for cold recycled mixture – cement bitumen treated material mixture with following binding agents: 3% cement and 5.5% emulsion (C3E5.5). Mixture was designed according to Polish requirements for the base course of pavement. Mixture contains 60% of RAP material. Specimen size: f=100 mm, h=62,1 - 63,7 mm.
Additionally set presents the figures of destruction interfaces.
Data was obtained in the HYD-25 hydraulic universal machine (Cooper Ltd) for 1 temperature (+20°C). Indirect tensile fatigue test was used; IT-CY scheme acc. to EN 12697-26 standard)
Test load was selected as impulse loading with varied initial strain range – from 49 µm up to 205 µm.
Dataset file
hexmd5(md5(part1)+md5(part2)+...)-{parts_count}
where a single part of the file is 512 MB in size.Example script for calculation:
https://github.com/antespi/s3md5
File details
- License:
-
open in new tabCC BYAttribution
Details
- Year of publication:
- 2024
- Verification date:
- 2024-01-24
- Dataset language:
- English
- Fields of science:
-
- civil engineering, geodesy and transport (Engineering and Technology)
- DOI:
- DOI ID 10.34808/jg2z-wj22 open in new tab
- Funding:
- Series:
- Verified by:
- Gdańsk University of Technology
Keywords
References
Cite as
Authors
seen 109 times