Description
Gdansk 2020, Grunwaldzka (E) street - video data - pedestrian, bicycles, vehicles
The data contain video traffic data (pedestrian, cyclists, vehicles) registered at Grunwaldzka (E) street. Date 11.08.2020, 6:00-20:00. The video camera was installed around bicycle crossings and pedestrian crossings at Grunwaldzka – ul. Miszewskiego – Do Studzienki crossing. Camera was mounted on 7-meter-high mast.
Collected data:
- the highest volume of vehicles passing the pedestrian and bicycle crossing were recorded at 12:00 a.m. - 01:00 p.m.
- most pedestrians were recorded between 04:00 p.m. - 05:00 p.m. and cyclists between 04:00 p.m. – 05:00 p.m.
- avg hourly intensity of vehicles within the pedestrian and bicycle crossing were 1684 veh./h.
- avg of 267 ped./h on the pedestrian crossing.
- avg of 48 cyc./h on the bicycle crossing.
GPS coordinates: 54.37574290591228, 18.614816407537877
This study is part of master thesis: Conflicts research in relationships vehicle - pedestrian and vehicle - a bicycle on selected crossings in Gdansk.
Dataset file
Grunwaldzka.zip
29.0 GB,
S3 ETag
16e0a120d87a28222eaecd5ad7d9e5d2-59,
downloads: 66
The file hash is calculated from the formula
Example script for calculation:
https://github.com/antespi/s3md5
hexmd5(md5(part1)+md5(part2)+...)-{parts_count}
where a single part of the file is 512 MB in size.Example script for calculation:
https://github.com/antespi/s3md5
File details
- License:
-
open in new tabCC BY-NC-SANon-commercial - Share-alike
- Raw data:
- Data contained in dataset was not processed.
Details
- Year of publication:
- 2020
- Verification date:
- 2021-01-04
- Creation date:
- 2020
- Dataset language:
- English
- Fields of science:
-
- Civil engineering and transport (Engineering and Technology)
- DOI:
- DOI ID 10.34808/jmyx-vp27 open in new tab
- Series:
- Verified by:
- Gdańsk University of Technology
Keywords
Cite as
Authors
seen 147 times