Fatigue data of Cement Bitumen Treated Material Mixture C3E5.5 (over 28 days of curing at 20C, field cores) - Open Research Data - Bridge of Knowledge

Search

Fatigue data of Cement Bitumen Treated Material Mixture C3E5.5 (over 28 days of curing at 20C, field cores)

Description

Dataset presents data of fatigue life determined for cold recycled mixture – cement bitumen treated material mixture with following binding agents: 3% cement and 5.5% emulsion (C3E5.5). Mixture was designed according to Polish requirements for the base course of pavement. Mixture contains 60% of RAP material. Specimen size: f=100 mm, h=48,4 - 70,9 mm. 

Specimen for the test were obtained from the field in May 2024.

Additionally set presents the figures of destruction interfaces.

Data was obtained in the HYD-25 hydraulic universal machine (Cooper Ltd) for 1 temperature (+20°C). Indirect tensile fatigue test was used; IT-CY scheme acc. to EN 12697-26 standard)

Test load was selected as impulse loading with varied initial strain range – from 15 µm up to 205 µm.

Dataset file

ITFT Fatigue test - field cores.rar
99.3 MB, S3 ETag 170eb61ac3c956360f8c0301635de134-1, downloads: 57
The file hash is calculated from the formula
hexmd5(md5(part1)+md5(part2)+...)-{parts_count} where a single part of the file is 512 MB in size.

Example script for calculation:
https://github.com/antespi/s3md5

File details

License:
Creative Commons: by 4.0 open in new tab
CC BY
Attribution

Details

Year of publication:
2024
Verification date:
2024-07-05
Dataset language:
English
Fields of science:
  • civil engineering, geodesy and transport (Engineering and Technology)
DOI:
DOI ID 10.34808/cvv9-k479 open in new tab
Funding:
Series:
Verified by:
Gdańsk University of Technology

Keywords

Cite as

seen 94 times