Abstract
The paper discusses problem of power and energy metering in double circuit overhead transmission line. Considerations are based on example of transmission line connecting Polish substation Bis Elk and Lithuanian substation Alytus.
Authors (5)
Cite as
Full text
full text is not available in portal
Keywords
Details
- Category:
- Monographic publication
- Type:
- rozdział, artykuł w książce - dziele zbiorowym /podręczniku w języku o zasięgu międzynarodowym
- Title of issue:
- Safety of the Polish power system: Edition 2016 strony 35 - 42
- Language:
- English
- Publication year:
- 2016
- Bibliographic description:
- Lubośny Z., Klucznik J., Dobrzyński K., Pokora S., Trębski R.: Power and energy measurement problems in transmission line between Poland-Lithuania// Safety of the Polish power system: Edition 2016/ ed. Józef Lorenc, Andrzej Demenko Poznań: Scientific Publishers OWN, Poznań, 2016, s.35-42
- Verified by:
- Gdańsk University of Technology
seen 118 times