Dane badawcze
Filtry
wszystkich: 156
Katalog Danych Badawczych
-
Deformation Sweep Test of Cement Bitumen Treated Material Mixture C3E5.5 (field obtained material; over 28 days of curing at 20C)
Dane BadawczeDataset presents data of results of deformation sweep test determined for cold recycled mixture – cement bitumen treated material mixture with following binding agents: 3% cement and 5.5% emulsion (C3E5.5). Mixture was designed according to Polish requirements for the base course of pavement. Mixture contains 60% of RAP material. Specimen size: f=100...
-
Complex modulus of Cement Bitumen Treated Material Mixture C3E5.5 (over 28 days of curing at 20C)
Dane BadawczeDataset presents data of complex modulus determined for cold recycled mixture – cement bitumen treated material mixture with following binding agents: 3% cement and 5.5% emulsion (C3E5.5). Mixture was designed according to Polish requirements for the base course of pavement. Mixture contains 60% of RAP material. Specimen size: f=100 mm, h=130 mm. Specimen...
-
projects of noise level on railway lines
Dane BadawczeProjects of acoustic signals from railway lines for further analysis in the BK Connect software.
-
Projects of noise level on railway lines
Dane BadawczeProjects of acoustic signals from railway lines for further analysis in the BK Connect program.
-
Fatigue data of Cement Bitumen Treated Material Mixture C3E5.5 (over 28 days of curing at 20C)
Dane BadawczeFatigue data of Cement Bitumen Treated Material Mixture C3E5.5 (over 28 days of curing at 20C)
-
Complex modulus of Cement Bitumen Treated Material Mixture C3E4 field mixed/laboratory compacted (7-365 days of curing at 20C)
Dane BadawczeDataset presents data of complex modulus determined for cold recycled mixture – cement bitumen treated material mixture with following binding agents: 3% cement, 4% emulsion (C3E4). Mixture was designed according to Polish requirements for the base course of pavement. Mixture was mixed in the field conditions and later compacted in laboratory. Mixture...
-
Complex modulus of Cement Bitumen Treated Material Mixture C3E4 cores obtained from the field section (28-365 days of curing at the field and later in laboratory at 20C)
Dane BadawczeDataset presents data of complex modulus determined for cold recycled mixture – cement bitumen treated material mixture with following binding agents: 3% cement, 4% emulsion (C3E4). Mixture was designed according to Polish requirements for the base course of pavement. Specimen were obtained from the field at 28, 180, 270 and 365 days after compaction....
-
Complex modulus of Cement Bitumen Treated Material Mixture C3E4 laboratory mixed/laboratory compacted (7-365 days of curing at 20C)
Dane BadawczeDataset presents data of complex modulus determined for cold recycled mixture – cement bitumen treated material mixture with following binding agents: 3% cement, 4% emulsion (C3E4). Mixture was designed according to Polish requirements for the base course of pavement. Mixture was mixed in laboratory conditions on the basis of materials obtained from...
-
Complex modulus of Cement Bitumen Treated Material Mixture (28 days of curing at 20C)
Dane BadawczeDataset presents data of complex modulus determined for cold recycled mixture – cement bitumen treated material mixture with 3 combinations of binding agents: 2% cement, 6% emulsion (C2E6), 6% cement, 6% emulsion (C6E6), 6% cement, 2% emulsion (C6E2). Mixture was designed according to Polish requirements for the base course of pavement. Mixture contains...
-
Katania, 2023, Road SS114 – csv data from sensors on bicycle
Dane BadawczeData collected with bicycle-mounted sensors on 06.07.2023 while cycling on the cycle path along the SS114 road in Catania. The data includes parameters such as: gps coordinates- txt files, brain waves and heart rate- csv file.
-
Finite element models used in diagnostics of transverse cracks in bridge approach pavement
Dane BadawczeTransverse cracks in the asphalt pavement were observed on bridge structures next to single-module expansion joints with a 5 meter approach slab set at the depth of 1 m. The finite element (FE) models of the approach pavement were created to investigate the reasons of premature cracking and crack initiation mechanism over the back edge of the abutment...
-
Kowalewo Pomorskie 2021 - video data - pedestrian, bicycles, vehicles
Dane BadawczeKowalewo Pomorskie 2021 - video data - pedestrian, bicycles, vehicles
-
Krotoszyn 2021 - video data I - pedestrian, bicycles, vehicles
Dane BadawczeKrotoszyn 2021 - video data - pedestrian, bicycles, vehicles
-
Gostyn 2021 - video data I - pedestrian, bicycles, vehicles
Dane BadawczeGostyn 2021 - video data - pedestrian, bicycles, vehicles
-
Miedzyborz 2021 - video data I - pedestrian, bicycles, vehicles
Dane BadawczeMiedzyborz 2021 - video data - pedestrian, bicycles, vehicles
-
Gdynia Wielkopolska street 2020 - video traffic data
Dane BadawczeGdynia Wielkopolska street 2020 - video traffic data
-
Park and Ride system in Gdansk 2020- video traffic data
Dane BadawczePark and Ride system in Gdansk 2020- video traffic data
-
Olsztyn 2019- video traffic data
Dane BadawczeOlsztyn 2019- video data
-
DK16 Mrągowo-Ełk 2017- video data
Dane BadawczeDK16 Mrągowo-Ełk 2017- video data
-
Pruszcz Gdański 2019- video data
Dane BadawczePruszcz Gdański 2019- video data