Abstract
Appropriate risk assessment plays a fundamental role in the design. . The authors propose a possible method of design risk mitigation, which follows recommendations included in Eurocode 7. The so-called “Observational Method” (OM) can produce savings in costs and programmes on engineering projects without compromising safety. The case study presented is a complex design solution that deals with the heavy foundations of a gantry crane beam as one of the elements of a Deepwater Container Terminal extension. The paper presents a detailed process of the design of the rear crane beam being a part of the brand new berth, together with its static analysis, as well as the long-term results of observations, which have revealed the real performance of the marine structure. The case presented is based on excessive preliminary field tests and technical monitoring of the structure, and is an example of a successful OM implementation and design risk mitigation.
Citations
-
9
CrossRef
-
0
Web of Science
-
1 1
Scopus
Authors (3)
Cite as
Full text
- Publication version
- Accepted or Published Version
- DOI:
- Digital Object Identifier (open in new tab) 10.1515/pomr-2017-0095
- License
- open in new tab
Keywords
Details
- Category:
- Articles
- Type:
- artykuł w czasopiśmie wyróżnionym w JCR
- Published in:
-
Polish Maritime Research
no. 24,
pages 106 - 114,
ISSN: 1233-2585 - Language:
- English
- Publication year:
- 2017
- Bibliographic description:
- Miśkiewicz M., Mitrosz O., Brzozowski T.: PRELIMINARY FIELD TESTS AND LONG-TERM MONITORING AS A METHOD OF DESIGN RISK MITIGATION: A CASE STUDY OF GDAŃSK DEEPWATER CONTAINER TERMINAL// Polish Maritime Research. -Vol. 24, iss. 3(95) (2017), s.106-114
- DOI:
- Digital Object Identifier (open in new tab) 10.1515/pomr-2017-0095
- Verified by:
- Gdańsk University of Technology
seen 109 times
Recommended for you
Two tests for adhesive bonding long term characterization: principles and applications
- J. Jumel,
- M. Budzik,
- S. Chauffaille
- + 1 authors
Selecting wells for an optimal design of groundwater monitoring network based on monitoring priority map: A Kish Island case study
- H. Amiri,
- S. Azadi,
- S. Javadpour
- + 2 authors