Abstrakt
In the paper the quality fluctuations of leachate from municipal landfill in Gdansk (Poland) over the last 5 years and evaluation of a wetland system designed for treatment of the leachate are discussed.The research has been conducted during the 5 years period. The constructed wetland for leachate treatment, consisting of 2 horizontal subsurface flow reed beds, working in parallel was built in 2001. In the period 2005-06 it underwent modernization due to unsatisfactory treatment results caused by clogging of the beds. The treatment effectiveness after modernization is satisfactory. The effluent from bed I met Polish outflow standards, while in the effluent from bed II COD, total N and TSS exceeded the required concentrations. In spite of this, pre-treatment of leachate (iron removal) should be quickly introduced to protect the system against the repetition of clogging problems
Autorzy (3)
Cytuj jako
Pełna treść
- Wersja publikacji
- Accepted albo Published Version
- Licencja
- otwiera się w nowej karcie
Słowa kluczowe
Informacje szczegółowe
- Kategoria:
- Publikacja w czasopiśmie
- Typ:
- artykuły w czasopismach recenzowanych i innych wydawnictwach ciągłych
- Opublikowano w:
-
Journal of Ecological Engineering
strony 202 - 211,
ISSN: 2299-8993 - Język:
- angielski
- Rok wydania:
- 2011
- Opis bibliograficzny:
- Obarska-Pempkowiak H., Gajewska M., Wojciechowska E.: Operational problems of constructed wetland for landfill leachates treatment: case study// Inżynieria Ekologiczna. -., nr. nr 25 (2011), s.202-211
- Weryfikacja:
- Politechnika Gdańska
wyświetlono 103 razy
Publikacje, które mogą cię zainteresować
Reliability and efficiency of pollution removal during long-term operation of a one-stage constructed wetland system with horizontal flow
- K. Jóźwiakowski,
- P. Bugajski,
- Z. Mucha
- + 7 autorów