Filters
total: 54
filtered: 4
Chosen catalog filters
Search results for: COMPACTION
-
Deflection measurement of field section with pavement with base course made of Cement Bitumen Treated Material Mixture C3E4 (28, 180, 270, 365 days after compaction)
Open Research DataDataset presents data of deflections determined for pavement with base course made of cold recycled mixture – cement bitumen treated material mixture with following binding agents: 3% cement, 4% emulsion (C3E4). Mixture was designed according to Polish requirements for the base course of pavement. Mixture was mixed in stationary plant and compacted...
-
Finite element models used in diagnostics of transverse cracks in bridge approach pavement
Open Research DataTransverse cracks in the asphalt pavement were observed on bridge structures next to single-module expansion joints with a 5 meter approach slab set at the depth of 1 m. The finite element (FE) models of the approach pavement were created to investigate the reasons of premature cracking and crack initiation mechanism over the back edge of the abutment...
-
Deformation Sweep Test of Cement Bitumen Treated Material Mixture C3E5.5 (field cores; field curing)
Open Research DataDataset presents data of results of deformation sweep test determined for cold recycled mixture – cement bitumen treated material mixture with following binding agents: 3% cement and 5.5% emulsion (C3E5.5). Mixture was designed according to Polish requirements for the base course of pavement. Mixture contains 60% of RAP material. Specimen size: f=100...
-
Complex modulus of Cement Bitumen Treated Material Mixture C3E4 cores obtained from the field section (28-365 days of curing at the field and later in laboratory at 20C)
Open Research DataDataset presents data of complex modulus determined for cold recycled mixture – cement bitumen treated material mixture with following binding agents: 3% cement, 4% emulsion (C3E4). Mixture was designed according to Polish requirements for the base course of pavement. Specimen were obtained from the field at 28, 180, 270 and 365 days after compaction....