mgr inż. Maciej Malinowski
Employment
- Starszy wykładowca at Department of Engineering Structures
Publications
Filters
total: 97
Catalog Publications
-
Original footbridge in Mikolajki, Poland
PublicationIn summer 2016, a new footbridge in the town of Mikołajki (Poland) was built, over a stream connecting two adjacent lakes – Talty and Mikołajki. Its modern construction, based on the shape of a DN ice-boat, makes it inique in Poland, and probably in the world as well. This novel and dynamic shape became a significant landmark associated not only with Mikołajki, but also with the whole region of Mazury, as well as with sailing...
-
A 95-Year-Old Concrete Arch Bridge: From Materials Characterization to Structural Analysis
PublicationThe structural analysis of a 95-year-old concrete arch bridge located in Jagodnik (Poland) is performed in this paper, in order to check its behavior under today’s traffic loads. The mechanical properties of both the concrete and the reinforcement are investigated by testing cores and bar stubs extracted from the bridge. Structural analysis confirms that the bridge meets today’s load requirements in terms of bearing capacity, serviceability...
-
Zur Wiedergeburt einer historischen Gitterbrucke
PublicationMit Blick auf die komplizierte Geschichte der 160 Jahre alten schmiedeeisernen Gitterbrücke in Tczew (deutsch: Dirschau) über die Weichsel und in Bezug auf die Ideen ihrer Ertüchtigung wird im folgenden Beitrag die Untersuchung zur Probebelastung der originalen Felder des Überbaus beschrieben. Der historische Überbau der Weichselbrücke Dirschau wird dabei mit einer neuen Fahrbahn belastet. Es konnte die erforderliche Tragfähigkeit...
-
Case Study of Old Steel Riveted Railway Truss Bridge: From Material Characterization to Structural Analysis
PublicationThe structural analysis of an old steel riveted railway truss bridge located over the Maruska River on the Działdowo – Olsztyn, Poland railway line is performed in this paper to check its behaviour under today’s railway loads. The mechanical properties of construction steel extracted from the old steel bridge are investigated by tensile tests, impact tests through the Charpy pendulum impact V-notch, and an optical emission spectrometer....
-
Stan awaryjny wiaduktu kolejowego w Bydgoszczy
PublicationW pracy przedstawiono opis stanu awaryjnego wiaduktu kolejowego. Omówiono wyniki badań in situ oraz teoretycznych analiz statyczno-wytrzymałościowych ponad 100-letniego obiektu. Przedstawiono wnioski i zalecenia dotyczące doraźnego zabezpieczenia obiektu oraz warunki jego dalszej eksploatacji.
-
Próbne obciążenie drogowego mostu łukowego przez Wisłę w Toruniu. Badania diagnostyczne.
PublicationW artykule przedstawiono zakres oraz wyniki badań diagnostyczno-odbiorowych obciążenia próbnego mostu drogowego im. Elżbiety Zawackiej w Toruniu.W zakres testów wchodziły zarówno próby statyczne, jak i dynamiczne. Badania kontrolne obiektu powierzono Zespołowi Laboratorium Badań Terenowych Katedry Mechaniki Budowli i Mostów Politechniki Gdańskiej.
-
Założenia systemu i wstępne wyniki z monitoringu podczas montaż pierwszego przęsła mostu łukowego przez rzekę Wisłę w Toruniu
PublicationW pracy zaprezentowano założenia systemu monitoringu łukowego mostu głównego przez rzekę Wisłę w Toruniu w trakcie jego wznoszenia. Dzięki jego zamontowaniu możliwa jest bieżąca kontrola poprawności pracy konstrukcji. Budowany most drogowy w Toruniu jest dwuprzęsłową konstrukcją łukową o rekordowej w skali kraju rozpiętości przęseł 2x270 m. Dźwigary główne stanowią dwa nachylone do siebie stalowe łuki o zamkniętym przekroju skrzynkowym...
-
Awaria wiaduktu nad obwodnicą Trójmiasta
PublicationOpisano awarię wiaduktu drogowego spowodowaną uderzeniem ponadnormatywnego gabarytowo pojazdu. Zwrócono uwagę na skutki uderzenia, powodujące zniszczenie jednego z przęseł. Przedstawiono wyniki teoretycznych analiz statyczno-wytrzymałościowych wiaduktu w stanie awaryjnym oraz w fazach rozbiórki uszkodzonego przęsła. Omówiono sposób doraźnego zabezpieczenia obiektu, warunki dalszej eksploatacji oraz sposób naprawy.
-
Małe mosty kolejowe z płytą ortotropową
PublicationW pracy przedstawiono wyniki badań i analiz obliczeniowych mostów kolejowych małych rozpiętości z pomostami w formie płyty ortotropowej. Przedstawiono sposoby modelowania tych konstrukcji. Podano zakres i metodykę prowadzonych badań in situ. Wyniki analiz teoretycznych porównano z wynikami badań. Przedstawiono wnioski dotyczące sposobów modelowania tego typu konstrukcji i konieczności badań in situ oraz stosowania zaawansowanych...
-
O badaniach i analizach mostów tymczasowych typu Bailey - MS 22-80
PublicationPrzedstawiono sposoby modelowania oraz wyniki badań in situ konstrukcji mostów tymczasowych typu Bailey - MS 22-80. Sformuowano wnioski dotyczące rzeczywistego zachowania się tego rodzaju konstrukcji oraz zasad modelowania w celu jednoznacznego określenia pracy i wytężenia ustroju.
-
Badania i analizy kolejowych konstrukcji odciążających typu mostowego
PublicationW pracy przedstawiono i omówiono wybrane modele obliczeniowe, wyniki analiz teoretycznych oraz badań trzech typów kolejowych konstrukcji odciążających typu mostowego. Zaprezentowano modele obliczeniowe oraz metodykę badań in situ tego typu konbstrukcji. Przedstawiono wnioski dotyczące zaawansowanych metod obliczeniowych rozszerzonych badań in situ w celu diagnozowania rzeczywistej pracy obiektów mostowych.
-
Ekspertyza techniczna oraz wielowariantowa koncepcja zabezpieczenia rotundy palmiarni w ogrodzie botanicznym w gdańsku oliwie
PublicationCelem opracowania jest określenie aktualnego stanu technicznego oraz wskazanie możliwych wariantów rozwiązań zabezpieczenia i modernizacji rotundy palmiarni w ogrodzie botanicznym w Gdańsku Oliwie. Potrzeba rozbudowy konstrukcji rotundy palmiarni wynika z wzrostu palmy daktylowej znajdującej się w obiekcie.
-
Ekspertyza techniczna wiaduktu kolejowego w km 368,461 linii 121 Chorzów Batory - Tczew nad ul. Grunwaldzką w Bydgoszczy
PublicationPraca jest ekspertyzą określającą aktualny stan techniczny, nośność oraz warunki dalszej eksploatacji wiaduktu kolejowego w ciągu linii Chorzów Batory - Tczew nad Grunwaldzką w Bydgoszczy.W pracy przedstawiono i zawarto:* wyniki szczegółowych oględzin obiektu wraz z dokumentacją fotograficzną ilustrującą aktualny stan techniczny,* projekt weryfikującego próbnego obciążenia,* wyniki badań in situ obiektu podczas próbnego obciążenia...
-
Mosty tymczasowe typu BAILEY - MS 22-80 w świetle badań in SITU
PublicationW pracy przedstawiono i omówiono zakres badań, wybrane modele obliczeniowe, wyniki analiz teoretycznych i badań odbiorowych (próbnych obciążeń o rozszerzonym zakresie), oraz spostrzeżenia dotyczące zachowania się konstrukcji na przykładzie kilku badanych obiektów mostów tymczasowych typu bailey - MS 22-80.
-
ARCHED VIADUCT OVER PKP TRACKTS IN TCZEW
PublicationPraca stanowi streszczenie artykułu dotyczącego nietypowego wiaduktu łukowego z jednym dźwigarem głównym. Omówiono konstrukcję, technologię wznoszenia modele obliczeniowe,analizy teoretyczne oraz metodykę i wyniki przeprowadzonych badań in situ obiektu.
-
Awaria wiaduktu nad autostradą A2
PublicationW pracy przedstawiono opis awarii i działań naprawczych drogowego wiaduktu po uderzeniu przejeżdżającej pod nim koparki. zwrócono uwagę na skutki uderzenia, ich wpływ na wytężenie konstrukcji. przedstawiono wyniki teoretycznych analiz statyczni-wytrzymałościowych wiaduktu w stanie poawaryjnym. omówiono sposób doraźnego zabezpieczenia i naprawy obiektu oraz warunki dalszej jego eksploatacji. przedstawiono wyniki dodatkowych badań...
-
Analiza mostu kolejowego przez rzekę Martwa Wisła w Gdańsku
PublicationOpracowanie dotyczy konstrukcji nowoprojektowanego mostu kolejowego przez rzekę Martwa Wisła w Gdańsku budowanego w ramach zadania "Projekt poprawy dostępu kolejowego do Portu Gdańsk" (most + dwutorowa linia kolejowa). Celem opracowania jest przeprowadzenie analizy obliczeniowej mostu na podstawie jego charakterystyk dostarczonych przez Zleceniodawcę - Biuro Projektów Budownictwa Komunalnego w Gdańsku w formie projektu architektoniczno-budowlanego....
-
Stan awaryjny wiaduktu kolejowego w Bydgoszczy
PublicationW pracy przedstawiono opis stanu awaryjnego wiaduktu kolejowego. Omówiono wyniki badań in situ oraz teoretycznych analiz statyczno-wytrzymałościowych ponad 100-letniego obiektu. Przedstawiono wnioski i zalecenia dotyczące doraźnego zabezpieczenia obiektu oraz warunki jego dalszej eksploatacji.
-
Kolejowe konstrukcje odciążające typu mostowego w świetle badań in situ i analiz teoretycznych
Publication -
Obliczenia niezawodności użytkowej kładek dla pieszych
PublicationW pracy zaprezentowano metodę obliczania niezawodności użytkowej kładek dla pieszych. Obciążenie pieszymi opisano definiując następujące zmienne losowe: amplitudę i częstość wymuszenia pieszego, jego prędkość, a także czas i miejsce pojawienia się na kładce. Zastosowano metodę Monte Carlo. Wygenerowane realizacje obciążenia stanowią zbiór danych wejściowych do obliczeń przeprowadzanych dowolnym programem stosującym metodę elementów...
-
Mosty kolejowe małych rozpiętości - obliczenia i badania
PublicationW pracy przedstawiono wyniki badań i analiz obliczeniowych mostów kolejowych ma-łych rozpiętości. Przedstawiono sposoby modelowania w celu wiernego odzwierciedlenia rzeczywistej pracy konstrukcji. Podano zakres i metodykę prowadzonych badań in situ. Wy-niki analiz teoretycznych porównano z wynikami badań. Przedstawiono wnioski dotyczące sposobów modelowania tego typu konstrukcji i konieczności badań in situ oraz stosowania zaawansowanych...
-
Awaria wiaduktu w m. Borkowo nad obwodnicą Trójmiasta
PublicationW referacie przedstawiono opis awarii drogowego wiaduktu wywołanej uderzeniem w obiekt ponadnormatywnego gabarytowo pojazdu. Zwrócono uwagę na skutki uderzenia, powodujące zniszczenie konstrukcji jednego z przęseł. Przedstawiono wyniki teoretycznych analiz statyczno-wytrzymałościowych wiaduktu w stanie awaryjnym oraz w fazach rozbiórki uszkodzonego przęsła. Omówiono sposób doraźnego zabezpieczenia obiektu oraz warunki dalszej jego...
-
Łukowa kładka dla pieszych podczas próbnego obciążenia
PublicationPraca zawiera wybrane charakterystyki łukowej kładki dla pieszych, w tym opis badań podczas próbnego obciążenia, reprezentatywne wyniki pomiarów i analizy MES. Szczególną uwagę zwrócono na problem dynamiczny. Ten bardzo efektowny od strony estetycznej obiekt, ze względu na przyjęty schemat statyczny oraz niewielki ciężar, tak jak większość lekkich mostów dla pieszych, w łatwy sposób ulega znacznym wzbudzeniom. W wyniku badań stwierdzono,...
-
Ekspertyza techniczna dotycząca uszkodzenia wiaduktu drogowego nr 17 nad Obwodnicą Trójmiasta w km. 349+230 w m. Borkowo
PublicationOpracowanie zawiera rezultaty analiz wykonanych na potrzeby określenia wpływu uderzenia w konstrukcję nośną wiaduktu. Opracowano zalecenia do działań pozwalających na przywrócenie pierwotnego użytkowania obiektu.
-
Ekspertyza techniczna dotycząca uszkodzenia wiaduktu drogowego nr 17 nad Obwodnicą Trójmiasta w km 349+230 w m. Borkowo
PublicationOpracowanie zawiera ocenę stanu konstrukcji po uszkodzeniu oraz rezultaty symulacji numerycznych i wnioski dotyczące możliwości przywrócenia pierwotnego charakteru obiektu.
-
Theoretical analysis of the cable-stayed bridge over brda river in Bydgoszcz
PublicationThe topic of this article is the numerical analysis carried out for the cable-stayed tram (road) bridge over Brda river in Bydgoszcz. The goal of numerical studies was the verification of project assumptions and construction solutions elaborated by the autonomous team. The bridge calculations were conducted on three independent FEM models The internal forces and the elements effort under different loading schemes were examined....
-
Test loading of the longest span arch bridge in Poland
PublicationBridge structures undergo thorough examination during test loading before they come into use. The aim of the examination is to check the correctness of the working structure and construction design assumptions. Test loading on the bridge is preceded by examination specification. This paper describes computational model and test loading results carried out during examibation of the bridge over the Vistula within the bypass of Puławy...
-
Drogowy most przez Wisłę w Tczewie stan dzisiejszy, a możliwości modernizacji
PublicationMost Tczewski będący jedyną przeprawą drogową przez rzekę Wisłę w Tczewie jest wspaniałym zabytkiem sztuki inżynierskiej uznanym za obiekt europejskiego dziedzictwa kultury technicznej. Rozdział zawiera opis konstrukcji, aktualnego stanu technicznego oraz możliwości modernizacji i dalszej eksploatacji mostu.
-
System ciągłej obserwacji stanu technicznego hali ''Olivia'' w Gdańsku
PublicationCelem artykułu jest przedstawienie prototypowego syste-mu monitoringu technicznego zainstalowanego w Hali "Olivia" w Gdańsku. System określany jest nazwą "SMT OLIVIA-2". System został oddany do użytku 16 marca 2009 roku. System monitoringu technicznego "SMT OLIVIA-2" przeznaczony jest do zdalnego monitorowania podstawowych parametrów pracy konstrukcji dachu i w sposób zautomatyzowany sygnalizowanie o jej stanie technicznym. W przy-padku...
-
System monitoringu technicznego Hali Sportowo-Widowiskowej "Olivia" w Gdańsku (SMT OLIVIA-2)
PublicationSystem SMT OLIVIA-2 ma za zadanie monitorowanie podstawowych parametrów pracy konstrukcji dachu i w sposób zautomatyzowany sygnalizowanie o jej stanie technicznym. System jest nowatorskim rozwiązaniem technologicznym. Nowością w stosunku do dostępnych na rynku ofert jest w szczególności rozbudowany moduł obliczeniowy bazujący na szczegółowym modelu teoretycznym dachu oraz zintegrowany z nim system ekspercki.
-
Ekspertyza techniczna dotycząca uszkodzenia wiaduktu drogowego nr 17 nad Obwodnicą Trójmiasta
PublicationOpracowanie zawiera wyniki zaawansowanej analizy mes konstrukcji wiaduktu, który uległ awarii w wyniku uderzenia pojazdu. wskazano na sposób postępowania w celu przywrócenia obiektu do użytkowania.
-
Systemy monitorowania stanu technicznego konstrukcji na przykładzie trzech mostów
PublicationW niniejszej pracy zaprezentowano systemy monitoringu trzech obiektów mostowych. Jeden z przedstawionych systemów dotyczy obiektu monitorowanego non stop, 24 godziny na dobę, nieprzerwanie od kilku lat, podczas gdy dwa pozostałe dotyczą badań obiektów prowadzonych w pewnych reprezentatywnych przedziałach czasowych.
-
Kładka dla pieszych nad ul. Ogińskiego w Bydgoszczy w świetle badań in situ
PublicationW pracy przedstawiono konstrukcję oraz metodykę badań pod próbnym obciążeniem kładki dla pieszych nad ul. Ogińskiego w Bydgoszczy. Omówiono wyniki statycznych i dynamicznych oraz sformułowano dotyczące zachowania się konstrukcji i warunków eksploatacji obiektu.
-
Monitoring technologicznych ram zabezpieczenia przejść poprzecznych tunelu pod Martwą Wisłą w Gdańsku
PublicationPraca dotyczy systemu pomiarowego zastosowanego podczas monitoringu ram technologicznych wspierających drążenie przejść poprzecznych łączących oba główne korytarze tunelu pod Martwą Wisłą w Gdańsku. W pracy przedstawiono wyniki badań dwóch typów ram, uzyskane podczas wykonywania dwóch przejść. Wyniki pomiarów pozwalają na określenie stanu wytężenia konstrukcji ram w czasie prowadzenia robót oraz na oszacowaniu rzeczywistego stanu...
-
Doświadczenia z badań obiektów z łukiem na diagonali
PublicationW pracy przedstawiono konstrukcję oraz metodykę i zakres badań dwóch wiaduktów łukowych z dźwigarem głównym po diagonali pomostu.Przedstawiono modele obliczeniowe oraz zakres obliczeń statycznych i dynamicznych. Omówiono wyniki badań statycznych i dynamicznych analizowanych obiektów. Sformułowano wnioski dotyczące rzeczywistej pracy badanych obiektów oraz potrzeby zaawansowanych obliczeń i odpowiedniej metodyki tego rodzaju konstrukcji...
-
Doświadczenia z badań obiektów z łukiem po diagonali
PublicationW dotyczy dwóch obiektów mostowych - łukowych z łukiem po diagonali pomostu. Omówiono konstrukcje obiektów, metodykę badań tego typu konstrukcji. Przedstawiono i zanalizowano wyniki badań statycznych i dynamicznych analizowanych obiektów.
-
Próbne obciążenie obiektu
PublicationRozdział przedstawia analizy numeryczne MES, zakres, metody pomiarów oraz wyniki badań statycznych i dynamicznych mostu przez Wisłę w ciągu obwodnicy Płocka. Pomierzone wartości ugięć, przemieszczeń oraz odkształceń (naprężeń) podczas prób potwierdziły założenia teoretyczne przyjęte w projekcie oraz pracę mostu w zakresie sprężystym.
-
Badania mostu głównego przez Wisłę w ciągu obwodnicy Płocka
PublicationOpsano zakres, metody pomiarów oraz wyniki badań statycznych i dynamicznych mostu podwieszonego przez Wisłę w ciżgu obwodnicy Płocka. Pomierzone podczas prób wartości ugięć, przemieszczeń oraz odkształceń (naprężeń) okazały się zgodne z wartościami teoretycznymi wyznaczonymi w projekcie i potwierdziły pracę mostu w zakresie sprężystym.
-
Arch bridges under test loadings
PublicationThis paper illustrates experience in arch bridges test loadings of the research team of Department of Structural Mechanics and Bridge Structures from the Gdansk University of Technology. The presented calculations results constist the analysis of spatial construction schemes made using the finite elements method (FEM) and its comparison to the field studies. Arch bridges with the longest spans, visualisation of the computational...
-
Próbne obciążenie mostu przez Wisłę w Puławach
PublicationArtykuł zawiera opis modelu obliczeniowego, zakres wykonanych badań i wyniki próbnego obciążenia mostu łukowego w Puławach, znajdującego w ciągu obwodnicy miasta. Jest to obecnie największa tego typu konstrukcja w Polsce. Analizę i badania wykonał zespół Katedry Mechaniki Budowli i Mostów Politechniki Gdańskiej.
-
Modelowanie konstrukcji mostowych - obliczenia i weryfikacja ''in situ''
PublicationObiekty mostowe są konstrukcjami inżynierskimi, które ze względu na ich odpowiedzialność i długi okres eksploatacji - przed oddaniem do użytkowania poddawane są wszechstronnej ocenie w formie badań, zwanych potocznie próbnym obciążeniem. Zadaniem tych badań jest sprawdzenie poprawności pracy konstrukcji i przyjętych założeń projektowych. Przyciągające uwagę społeczeństwa próbne obciążenie na moście poprzedza projekt jego badań....
-
Modernizacja zabytkowych przęseł Lentze'a mostu drogowego przez rzekę Wisłę w Tczewie. Założenia i analizy numeryczne.
PublicationW pracy przedstawiono opis aktualnej konstrukcji, założenia modernizacji przęseł zabytkowych drogowego mostu przez rzekę Wisłę w Tczewie. Omówiono modele MES oraz wyniki analiz numerycznych analizowanych przęseł mostu.
-
Drogowy most przez rzekę Wisłe w Tczewie. Przeszłość - teraźniejszość - przyszłość. 1857 - 2016 - ?
PublicationW pracy przedstawiono burzliwą historię, konstrukcję i aktualny stan techniczny oraz koncepcje modernizacji drogowego mostu przez rzekę Wisłę w Tczewie,
-
Raport z badań podczas próbnego obciążenia konstrukcji odciążającej typu mostowego w km 20,151 LK nr 353 w m. Pobiedziska
PublicationW pracy przedstawiono metodykę pomiarów i wyniki badań podczas próbnego konstrukcji odciążającej typu mostowego w km 20,151 LK nr 353 w m. Pobiedziska. Sformułowano wnioski i wydano pinie dotyczącą rzeczywistej pracy konstrukcji i warunków dalszej eksploatacji obiektu.
-
Raport z badań podczas próbnego obciążenia wiaduktu kolejowego w km 165,161 LK nr 14 - konstrukcja w torze nr 1
PublicationW pracy przedstawiono metodykę pomiarów i wyniki badań podczas próbnego obciążenia wiaduktu kolejowego w km 165,161 LK nr 14.. Sformułowano wnioski i wydano pinie dotyczącą rzeczywistej pracy konstrukcji i warunków dalszej eksploatacji obiektu.
-
Raport z badań podczas próbnego obciążenia wiaduktu drogowego WD-15 w km 46+215,06. Budowa drogi ekspresowej S7 na odcinku Nidzica – Napierki od km 203+500 do km 223+818.
PublicationW pracy przedstawiono metodykę pomiarów i wyniki badań podczas próbnego obciążenia wiaduktu drogowego WD-15 w km 46+215,06 nad drogą S7 na odcinku Napierki - Nidzica. Sformułowano wnioski i wydano pinie dotyczącą rzeczywistej pracy konstrukcji i warunków dalszej eksploatacji obiektu.
-
Raport z badań podczas próbnego obciążenia wiaduktu drogowego WD-12 w km 40+629,89. Budowa drogi ekspresowej S7 na odcinku Nidzica – Napierki od km 203+500 do km 223+818.
PublicationW pracy przedstawiono metodykę pomiarów i wyniki badań podczas próbnego obciążenia wiaduktu drogowego WD-12 w km 40+629,89 nad drogą S7 na odcinku Napierki - Nidzica. Sformułowano wnioski i wydano pinie dotyczącą rzeczywistej pracy konstrukcji i warunków dalszej eksploatacji obiektu.
-
Raport z badań podczas próbnego obciążenia wiaduktu drogowego WD-9 w km 35+623,06. Budowa drogi ekspresowej S7 na odcinku Nidzica – Napierki od km 203+500 do km 223+818.
PublicationW pracy przedstawiono metodykę pomiarów i wyniki badań podczas próbnego obciążenia wiaduktu drogowego WD-9 w km 35+623,06 nad drogą S7 na odcinku Napierki - Nidzica. Sformułowano wnioski i wydano pinie dotyczącą rzeczywistej pracy konstrukcji i warunków dalszej eksploatacji obiektu.
-
Raport z badań podczas próbnego obciążenia wiaduktu drogowego WA-1 w ciągu projektowanej obwodnicy Kościerzyny w ciągu DK 20, nad drogą powiatową nr 2304G
PublicationW pracy przedstawiono metodykę pomiarów i wyniki badań statycznych i dynamicznych podczas próbnego obciążenia wiaduktu drogowego WA-1 w ciągu projektowanej obwodnicy Kościerzyny w ciągu DK 20, nad drogą powiatową nr 2304G. Sformułowano wnioski dotyczące rzeczywistej pracy konstrukcji i warunków dalszej eksploatacji obiektu.
-
Raport z badań podczas próbnego obciążenia wiaduktu drogowego WD-4 nad projektowaną obwodnicą Kościerzyny w ciągu DK 20, w ciągu DW 214
PublicationW pracy przedstawiono metodykę pomiarów i wyniki badań statycznych i dynamicznych podczas próbnego obciążenia wiaduktu drogowego WD-4 nad projektowaną obwodnicą Kościerzyny w ciągu DK 20, w ciągu DW 214. Sformułowano wnioski dotyczące rzeczywistej pracy konstrukcji i warunków dalszej eksploatacji obiektu.
seen 5218 times