Abstract
Conducting construction works in a building or in an area entered in the historic register is associated with the contracting authority's risk of incurring higher than planned costs of works, as well as delays in their implementation. In many cases, these deviations are completely independent of contracting authority and contractor. The aim of this article is to indicate the reasons for cost and time changes in the construction project, which is influenced by the historical conditions of the building site's location. In practice, the detailed considerations presented in the article may contribute to increasing the efficiency of spending public funds in the implementation of construction projects of a specific nature. Based on the selected example - reconstruction of the Old Pharmacy building located in the historic part of the old city of Gdańsk, the authors analyze and classify factors affecting the cost and time of construction works taking into account the historical conditions of the location of the facility.
Citations
-
0
CrossRef
-
0
Web of Science
-
0
Scopus
Authors (3)
Cite as
Full text
- Publication version
- Accepted or Published Version
- License
- Copyright (2018 The Authors)
Keywords
Details
- Category:
- Conference activity
- Type:
- publikacja w wydawnictwie zbiorowym recenzowanym (także w materiałach konferencyjnych)
- Title of issue:
- Proceedings of the Creative Construction Conference (2018) strony 679 - 686
- Language:
- English
- Publication year:
- 2018
- Bibliographic description:
- Apollo M., Grzyl B., Paweł J.: The influence of historical conditions on time and cost of construction project// Proceedings of the Creative Construction Conference (2018)/ ed. Miroslaw J. Skibniewski & Miklos Hajdu : , 2018, s.679-686
- DOI:
- Digital Object Identifier (open in new tab) 10.3311/ccc2018-090
- Bibliography: test
-
- H. Anysz, M. Książek, Wpływ opóźnień w realizacji kontraktu budowlanego na wzrost kosztów wykonawcy, in: Teoretyczne Podstawy Budownictwa, v. 2, Oficyna Wydawnicza Politechniki Warszawskiej, 2012.
- K. Ullah, A. H. Abdullah, S. Nagapan, S. Suhoo, M. S. Khan, Theoretical framework of the causes of construction time and cost overruns, IOP Conf. Ser. Mater. Sci. Eng. 271 (2017). open in new tab
- A. Senouci, A. Ismail, N. Eldin, Time Delay and Cost Overrun in Qatari Public Construction Projects, Procedia Eng. 164 (2016) 368-375. open in new tab
- Al Hammadi S., Nawab M. S., Study of Delay Factors in Construction Projects, Int. Adv. Res. J. Sci. Eng. Technol. 3 (2016) 87-93. open in new tab
- M. Głuszak, A. Leśniak, Construction Delays in Clients Opinion -Multivariate Statistical Analysis, Procedia Eng. 123 (2015) 182-189. open in new tab
- H. Anysz, A. Zbiciak, Przyczyny powstawania opóźnień w realizacji kontraktów budowlanych -analiza wstępnych wyników badania ankietowego, Autobusy 14 (2013) 963-972. open in new tab
- A. Abderisak, P.E. Josephson, G. Lindahl, Aggregation of factors causing cost overruns and time delays in large public construction projects: Trends and implications, Eng. Constr. Archit. Manag. 24/3 (2017) 393-406.
- G. Niazi, N. Painting, Significant Factors Causing Cost Overruns in the Construction Industry in Afghanistan, Proc. Eng. 182 (2017) 510-517. open in new tab
- A. Abderisak, P.E. Josephson, G. Lindahl, Implications of Cost Overruns and Time Delays on Major Public Construction Projects, in: Proceedings of the 19th International Symposium on Advancement of Construction Management and Real Estate (2015).
- N. Al-Hazim, Z. A. Salem, H. Ahmad, Delay and Cost Overrun in Infrastructure Projects in Jordan, Procedia Eng. 182 (2017) 18-24. open in new tab
- S. Lindhard, S. Wandahl, Exploration of the reasons for delays in construction, Int. J. Constr. Manag. 14 (2014) 47-57. open in new tab
- G. Polat, F. Okay, E. Eray, Factors Affecting Cost Overruns in Micro-scaled Construction Companies, Procedia Eng. 85 (2014) 428-435. open in new tab
- B. Flyvbjerg, M.K. Holm, How common and how large are cost overruns in transport infrastructure projects?, Transp. Rev. 23 (2003) 71-88. [14] World Bank (2012), Construction Sector Transparency Program Goes Global [Online]: http://www.worldbank.org/en/news/feature/2012/11/08/construction-sector-transparency-program-goes-global. open in new tab
- A. Leśniak, E. Plebankiewicz, Opóźnienia w robotach budowlanych, Zesz. Nauk. WSOWL 3/157 (2010).
- D. Kowalski, B. Grzyl, A. Kristowski, The Cost Analysis of Corrosion Protection Solutions for Steel Components in Terms of the Object Life Cycle Cost, Civ. Environ. Eng. Rep. 26/3 (2017) 5-13. open in new tab
- M. W. Kembłowski, B. Grzyl, A. Kristowski, A. Siemaszko, Risk Modelling with Bayesian Networks-Case Study: Construction of Tunnel under the Dead Vistula River in Gdansk, Procedia Eng. 196 (2017) 585-591. open in new tab
- B. Grzyl, A. Kristowski, K. Jamroz, A. Gobis, Methods of estimating the cost of traffic safety equipment's life cycle, MATEC Web Conf. EDP Sci. 122/ 02003 (2017). open in new tab
- H. Anysz, T. Benedysiuk, Wpływ warunków miejskich na harmonogram budowy na przykładzie budowy obiektu biurowego, Logistyka 6 (2014) 1488-1495.
- A. Bortkiewicz, A. Wańska, Wstępne badania historyczno-konserwatorskie budynku Starej Apteki w Gdańsku. Gdańsk (2015).
- Ustawa z dnia 23 lipca 2003 r. o ochronie zabytków i opiece nad zabytkami (Dz.U nr 162 poz. 1568) (2003). open in new tab
- The decision of the Provincial Pomeranian Conservator of Monuments No. ZN.5142.744.2017.AK of 06/10/2017. open in new tab
- Verified by:
- Gdańsk University of Technology
seen 101 times