Filters
total: 1592
filtered: 9
-
Catalog
- Publications 901 available results
- Journals 13 available results
- Publishing Houses 2 available results
- People 347 available results
- Inventions 8 available results
- Projects 9 available results
- Laboratories 2 available results
- Research Teams 4 available results
- Research Equipment 1 available results
- e-Learning Courses 275 available results
- Events 30 available results
Chosen catalog filters
Search results for: WENTYLACJA MECHANICZNA
-
Broker Innowacji n/d
ProjectsProject realized in Faculty of Mechanical Engineering according to DS/1474/25/W15/BI/2013 agreement from 2013-11-18
-
HydmAG Hydromechanical automatic gearbox for agricultural vehicles and heavy machinery
ProjectsProject realized in Department of Mechanics and Mechatronics according to LIDER//22/0130/L-8/NCBR/2017 agreement from 2017-12-13
-
Kształcenie zamawiane na kierunku mechatronika na Wydziale Mechanicznym Politechniki Gdańskiej/Kształcenie zamawiane na Wydziale Mechanicznym PG - mechatronika
ProjectsProject realized in Faculty of Mechanical Engineering according to UDA.POKL.04.01.02-00-049/09-00 agreement from 2010-03-16
-
DROZD An unmanned water surface-air-based platform using the wing-in-ground effect for support of the special armed forces at sea area.
ProjectsProject realized in Zakład Mechaniki, Wytrzymałości i Sterowania Złożonych Obiektów Technicznych
-
RID 4D Wpływ stosowania usług Inteligentnych Systemów Transportowych na poziom bezpieczeństwa ruchu drogowego
Projects -
3D-JAW The study of 3D temporo- mandibular joint (TMJ) model of bone-cartilage-ligament system mapping for effective commercialization of results in dental prosthetics, orthodontic and orthognathic surgery
ProjectsProject realized in Structural Mechanics Department according to POIR.04.01.02-00-0029/17-00 agreement from 2017-12-28
-
Monitoring of damage development in adhesive and bolted joints subjected to mechanical degradation by nonlinear Lamb wave propagation
ProjectsProject realized in Katedra Wytrzymałości Materiałów according to UMO-2015/19/B/ST8/00779 agreement from 2016-06-08
-
MURENA NIE DOTYCZY
ProjectsProject realized in Faculty of Electrical and Control Engineering according to DOB-1-1/1/PS/2014 agreement from 2014-12-30
-
Probabilistic analysis of the mechanical response variation of a tensegrity dome due to geometric and loading imperfections, with an estimation of the dome's sensitivity and operational reliability in terms of ultimate and serviceability limit states
ProjectsProject realized in Structural Mechanics Department