Design of Inner Gate for CRIST Shipyard Dry Dock - Publikacja - MOST Wiedzy

Wyszukiwarka

Design of Inner Gate for CRIST Shipyard Dry Dock

Abstrakt

The paper deals with a removable steel inner gate which was designed to separate two parts of a dry dock of about 70 m in width and 380 m in length. The gate allows for independent assembly of ship structures in two separated parts of the dock. The fore part of the dock can be flooded while the after part is dry. Tthe gate was designed by IDEK Company Ltd in 2011 and it was soon constructed and used by CRIST Shipyard in Gdynia.

Cytowania

  • 0

    CrossRef

  • 0

    Web of Science

  • 0

    Scopus

Słowa kluczowe

Informacje szczegółowe

Kategoria:
Publikacja w czasopiśmie
Typ:
artykuł w czasopiśmie wyróżnionym w JCR
Opublikowano w:
Polish Maritime Research nr 19, strony 52 - 56,
ISSN: 1233-2585
Język:
angielski
Rok wydania:
2012
Opis bibliograficzny:
Bogdaniuk M., Górecki Z.: Design of Inner Gate for CRIST Shipyard Dry Dock// Polish Maritime Research. -Vol. 19, iss. 1(72) (2012), s.52-56
DOI:
Cyfrowy identyfikator dokumentu elektronicznego (otwiera się w nowej karcie) 10.2478/v10012-012-0007-5
Weryfikacja:
Politechnika Gdańska

wyświetlono 164 razy

Publikacje, które mogą cię zainteresować

Meta Tagi