Filters
total: 110
filtered: 14
-
Catalog
Chosen catalog filters
Search results for: BITUMEN
-
The impact of carbon black particle size on curing characteristics of GTR modified with bitumen
Open Research DataPresented data shows an impact of particle size of GTR and three different loadings of carbon black on curing characteristics of GTR modified with bitumen. Samples were prepared using a two-roll mill – all in the same manner. After 24 hours of stabilization at ambient conditions they were submitted to the curing analysis via Rheometer Monsanto 100S....
-
Complex modulus of Cement Bitumen Treated Material Mixture (28 days of curing at 20C)
Open Research DataDataset presents data of complex modulus determined for cold recycled mixture – cement bitumen treated material mixture with 3 combinations of binding agents: 2% cement, 6% emulsion (C2E6), 6% cement, 6% emulsion (C6E6), 6% cement, 2% emulsion (C6E2). Mixture was designed according to Polish requirements for the base course of pavement. Mixture contains...
-
Fatigue data of Cement Bitumen Treated Material Mixture C3E5.5 (over 28 days of curing at 20C)
Open Research DataFatigue data of Cement Bitumen Treated Material Mixture C3E5.5 (over 28 days of curing at 20C)
-
Deformation Sweep Test of Cement Bitumen Treated Material Mixture C3E5.5 (field cores; field curing)
Open Research DataDataset presents data of results of deformation sweep test determined for cold recycled mixture – cement bitumen treated material mixture with following binding agents: 3% cement and 5.5% emulsion (C3E5.5). Mixture was designed according to Polish requirements for the base course of pavement. Mixture contains 60% of RAP material. Specimen size: f=100...
-
Complex modulus of Cement Bitumen Treated Material Mixture C3E5.5 (over 28 days of curing at 20C)
Open Research DataDataset presents data of complex modulus determined for cold recycled mixture – cement bitumen treated material mixture with following binding agents: 3% cement and 5.5% emulsion (C3E5.5). Mixture was designed according to Polish requirements for the base course of pavement. Mixture contains 60% of RAP material. Specimen size: f=100 mm, h=130 mm. Specimen...
-
Fatigue data of Cement Bitumen Treated Material Mixture C3E5.5 (Direct tension, over 28 days of curing at 20C)
Open Research DataFatigue data of Cement Bitumen Treated Material Mixture C3E5.5 (Direct tension, over 28 days of curing at 20C)
-
Fatigue data of Cement Bitumen Treated Material Mixture C3E5.5 (over 28 days of curing at 20C, field cores)
Open Research DataDataset presents data of fatigue life determined for cold recycled mixture – cement bitumen treated material mixture with following binding agents: 3% cement and 5.5% emulsion (C3E5.5). Mixture was designed according to Polish requirements for the base course of pavement. Mixture contains 60% of RAP material. Specimen size: f=100 mm, h=48,4 - 70,9 mm.
-
Complex modulus of Cement Bitumen Treated Material Mixture C3E4 laboratory mixed/laboratory compacted (7-365 days of curing at 20C)
Open Research DataDataset presents data of complex modulus determined for cold recycled mixture – cement bitumen treated material mixture with following binding agents: 3% cement, 4% emulsion (C3E4). Mixture was designed according to Polish requirements for the base course of pavement. Mixture was mixed in laboratory conditions on the basis of materials obtained from...
-
Complex modulus of Cement Bitumen Treated Material Mixture C3E4 field mixed/laboratory compacted (7-365 days of curing at 20C)
Open Research DataDataset presents data of complex modulus determined for cold recycled mixture – cement bitumen treated material mixture with following binding agents: 3% cement, 4% emulsion (C3E4). Mixture was designed according to Polish requirements for the base course of pavement. Mixture was mixed in the field conditions and later compacted in laboratory. Mixture...
-
Deformation Sweep Test of Cement Bitumen Treated Material Mixture C3E5.5 (field obtained material; over 28 days of curing at 20C)
Open Research DataDataset presents data of results of deformation sweep test determined for cold recycled mixture – cement bitumen treated material mixture with following binding agents: 3% cement and 5.5% emulsion (C3E5.5). Mixture was designed according to Polish requirements for the base course of pavement. Mixture contains 60% of RAP material. Specimen size: f=100...
-
Complex modulus of Cement Bitumen Treated Material Mixture C3E4 cores obtained from the field section (28-365 days of curing at the field and later in laboratory at 20C)
Open Research DataDataset presents data of complex modulus determined for cold recycled mixture – cement bitumen treated material mixture with following binding agents: 3% cement, 4% emulsion (C3E4). Mixture was designed according to Polish requirements for the base course of pavement. Specimen were obtained from the field at 28, 180, 270 and 365 days after compaction....
-
Deflection measurement of field section with pavement with base course made of Cement Bitumen Treated Material Mixture C3E4 (28, 180, 270, 365 days after compaction)
Open Research DataDataset presents data of deflections determined for pavement with base course made of cold recycled mixture – cement bitumen treated material mixture with following binding agents: 3% cement, 4% emulsion (C3E4). Mixture was designed according to Polish requirements for the base course of pavement. Mixture was mixed in stationary plant and compacted...
-
Curing characteristics of ground tire rubber modified by commercial additives
Open Research DataThe presented results show the influence of commercially available bitumen and transoctenamer rubber (TOR) on the curing behavior of GTR treated by a peroxide. Samples were prepared using a two-roll mill– all in the same manner. After 24 hours of aging at ambient conditions, they were submitted to the curing analysis via Rheometer Monsanto 100S. The...
-
Investigation of low-temperature cracks on selected national roads and motorways in Poland 2020
Open Research DataThe dataset contains video investigation and records of 68 road sections in various parts of Poland. Videos were recorded with the use of two cameras: 1) mounted in front of measurement vehicle, which was focused on overall view of road and 2) which was focused on pavement surface. The records are categorized according to the ID of the section given...