Filters
total: 3477
filtered: 17
-
Catalog
- Publications 2623 available results
- Journals 6 available results
- People 180 available results
- Inventions 30 available results
- Projects 17 available results
- Laboratories 6 available results
- Research Teams 17 available results
- Research Equipment 1 available results
- e-Learning Courses 575 available results
- Events 8 available results
- Offers 1 available results
- Open Research Data 13 available results
Chosen catalog filters
Search results for: KONSTRUKCJE PŁYWAJĄCE
-
MarLS Implementation of 3D laser scanning measurement procedure from a vessel
ProjectsProject realized in Department of Geodesy according to 1/07/2017 agreement from 2017-07-21
-
HydroNav3D Autonomous navigation and automatic 3D hydrography system of an unmanned floating platform
ProjectsProject realized in Marine Technology Sp. z o.o. according to POIR.01.01.01-00-0899/18 agreement from 2019-06-28
-
HydroDron Development of an autonomous/remote remote-controlled floating platform dedicated for hydrographic measurements on limited
ProjectsProject realized in Marine Technology Sp. z o.o. according to POIR.01.02.00-00-0074/16 agreement from 2019-01-01
-
Nowa strategia konstrukcji proleków przeciwgrzybowych na bazie peptydów penetrujących
ProjectsProject realized in Faculty of Chemistry according to UMO-2012/05/B/ST5/00291 agreement from 2013-01-30
-
RISPECT Risk-based expert system for through life ship structural inspection and maintenance and new-build ship structural design
ProjectsProject realized in Faculty of Ocean Engineering and Ship Technology according to 218499 agreement from 2008-12-19
-
Large displacement behavior of soil-structure interfaces under different boundary conditions
ProjectsProject realized in Department of Geotechnical and Hydraulic Engineering
-
Nowoczesna metoda badania skuteczności ochrony katodowej konstrukcji metalowych przy pomocy technik zmiennoprądowych
ProjectsProject realized in Faculty of Chemistry according to UMO-2012/05/N/ST8/02899 agreement from 2013-02-26
-
Opracowanie metody doboru konstrukcji wsporczej morskiej turbiny wiatrowej w polskich obszarach morskich
ProjectsProject realized in Faculty of Ocean Engineering and Ship Technology according to PBS1/A6/8/2012 agreement from 2012-12-04
-
Airpas X8 Development of BSP for search and rescue in the construction X8 type with tunnelled rotors
ProjectsProject realized in aiRPAS sp. z o.o Machines Sp.k according to POIR.01.01.01-00-0498/17 agreement from 2019-01-01
-
Czynniki wpływające na konkurencyjność zróżnicowanych funkcjonalnie bakterii nitryfikacyjnych AOB-NOB w układach ze skróconą ścieżką usuwania azotu
ProjectsProject realized in Department of Sanitary Engineering according to UMO-2017/26/D/ST8/00967 agreement from 2018-10-31
-
A method for evaluating airborne wear particle emissions from sliding contacts based on the novel aerodynamic chamber design
ProjectsProject realized in Zakład Mechaniki Stosowanej i Biomechaniki
-
Development of a full bipedal pedestrian HSI model taking into account the interaction between pedestrians and the footbridge structure.
ProjectsProject realized in Department of Engineering Structures
-
„Pylon 2” Innovative special-purpose structures of single and double circuit transmission towers for high voltage lines equipped with a communication system supplied directly from high voltage line
ProjectsProject realized in Faculty of Electrical and Control Engineering according to POIR.04.01.04-00-0060/20-00 agreement from 2021-01-05
-
Technetium Talent Management Grants Construction and characterization of an enzyme-electrode (bio)reactor for efficient simulation of phase II metabolic reactions of small-molecule chemical compounds exhibiting biological activity.
ProjectsProject realized in Wydział Chemiczny according to DEC-10/1/2024/IDUB/III.4c/Tc agreement from 2024-04-30
-
Investigation on combined effects of rotational stiffness of column bases and soil flexibility on seismic response and safety of structural steel buildings
ProjectsProject realized in Department of Building Engineering
-
ARCHITEKTURA CATALHOYUK Catalhoyuk in the Late Neolith (6500 - 5900 BC): reconstruction of the settlement layout based on architectural and structural aspects of buildings.
ProjectsProject realized in Department of History of Architecture and Conservation of Monuments from 2014-07-01
-
Shear stress connected with the fluid flow as an important parameter influencing the adhesion, invasion and tissue tropism of the uropathogenic E. coli polyadhesins to the host cells.
ProjectsProject realized in Department of Microbiology according to UMO-2014/13/B/NZ6/00257 agreement from 2015-02-09