Search results for: 3D CRANE
-
Design of modified PID controllers for 3D crane control
PublicationFrom the control viewpoint, 3D crane is a dynamic, nonlinear and multidimensional electromechanical system. In this paper, five control systems using a set-point weighted PID controllers (modified controllers) are designed. These structures and properties are presented. Optimization process of controllers settings based on integral performance indices is made. Simulation tests of control systems are presented. Comparison of integral...
-
Determination of rectification corrections for semi gantry crane rail axes in the local 3D coordinate system
PublicationElectronic tacheometers are currently the standard instruments used in geodetic work, including also geodetic engineering measurements. The main advantage connected with this equipment is among others high accuracy of the measurement and thus high accuracy of the final determinations represented for example by the points’ coordinates. One of many applications of the tacheometers is the measurement of crane rail axes. This measurement...
-
New Method for Determination of Adjustment Corrections for Crane Rail Axes
PublicationElectronic tacheometers are currently a standard instrument used in geodetic work, including also geodetic engineering measurements. One of the many applications of tacheometers in engineering geodesy are 3D control measurements of crane rail axes. This paper proposes a new method of computing adjustment corrections for crane rail axes based on 3D polar measurements performed with an electronic tacheometer. The intermediary method...
-
THE APPLICATION OF KALMAN FILTERING TO PREDICT VERTICAL RAIL AXIS DISPLACEMENTS OF THE OVERHEAD CRANE BEING A COMPONENT OF SEAPORT TRANSPORT STRUCTURE
PublicationAs the devices designed to transport materials, the overhead cranes should meet certain geometric requirements for their operation to be safe. The presently available geodetic equipment, in particular total stations, provides opportunities for precise 3D measurements of coordinates of the controlled points. These coordinates make a basis for correcting the height of crane runway axes. The paper presents a method to calculate position...
-
A New Geodetic Method of Examination of Geometrical Conditions of a Crane Bridge
PublicationSafety is one of the key aspects related to crane-based material transport. In order to ensure safe crane operation and material transport, it is necessary to meet certain geometrical conditions. The authors addressed the geometrical conditions of a crane bridge, a substantial crane component. The paper presents the method to compute displacement components of points on the top of a bridge crane relative to their design position....
-
Safety assessment of a concrete viaduct damaged by vehicle impact and an evaluation of the repair
PublicationDamage to lower parts of viaducts caused by impact from under-passing high vehicles is relatively frequent. One such incident, in which a viaduct was damaged by the impact from a truck with an improperly assembled hydraulic crane, is considered in this work. The analysis is based on a detailed object damage evaluation, 3D laser scanning, and numerical simulations. The aim of the study is to accurately model the vehicle impact into...
-
Mechanical-Level Hardware-In-The-Loop and Simulation in Validation Testing of Prototype Tower Crane Drives
PublicationIn this paper, the static and dynamic simulations, and mechanical-level Hardware-In-the-Loop (MHIL) laboratory testing methodology of prototype drive systems with energy-saving permanent-magnet electric motors, intended for use in modern construction cranes is proposed and described. This research was aimed at designing and constructing a new type of tower crane by Krupiński Cranes Company. The described research stage was necessary...
-
Influence of steel brackets supporting crane runway girders structure on the stress distribution in the brackets
PublicationThe paper presents a numerical analysis of steel brackets supporting a double-span crane runway girders. The purpose of the study was to assess the new structural solution based on the stress distribution in the brackets. In order to simplify the connection, the bottom flange of the crane runway girder is based directly on the upper flange of the bracket. As a result, the support reaction is no longer applied in the plane of the...
-
Modelling of network schedule including priority of selected technical resources
PublicationThe paper presents a method of network planning CPM – Critical Path Method. The author compares models of optimal solutions to design deadlines for individual works, taking various leading technical resources such as is labor and a tower crane into account.
-
PRELIMINARY FIELD TESTS AND LONG-TERM MONITORING AS A METHOD OF DESIGN RISK MITIGATION: A CASE STUDY OF GDAŃSK DEEPWATER CONTAINER TERMINAL
PublicationAppropriate risk assessment plays a fundamental role in the design. . The authors propose a possible method of design risk mitigation, which follows recommendations included in Eurocode 7. The so-called “Observational Method” (OM) can produce savings in costs and programmes on engineering projects without compromising safety. The case study presented is a complex design solution that deals with the heavy foundations of a gantry...
-
Modelling and Analysis of the Positioning Accuracy in the Loading Systems of Mobile Cranes
PublicationIn this work, the authors analyse the influence of the order and range of sequential movements of a crane's working members on the accuracy of the final cargo positioning. The analysis was conducted on the basis of a specially developed method in which the authors proposed the introduction of a geometrical indicator of positioning the load in the intermediate positions (after completing each movement sequence) and in the target...
-
Historical crane on the redesigned original trestle bridge as a memorial of Gdansk Shipyard
PublicationThe paper includes selected aspects of the study, whose goal is to hold the historical crane 642-24 in its current location after the modification of trestle bridge static scheme. The scope of the paper includes the assessment of current technical condition of the object, a presentation of FEM analyses, a description of the assumed load cases, results of the static calculations, checking the effort of construction elements, global...
-
A walk Around Gdańsk for Physicists
PublicationI provide a guide to Gdańsk (Danzig) and some of its suburbs, focusing on sites of particular interest to physicists. These include the Town Hall with the old Gdańsk standards of length at its entrance, the solar dial of 1588 on its corner, and its bell tower; the Naturalists Society; the medieval harbor crane; the medieval astronomical clock in St. Mary's Church; the late nineteenth-century lighthouse and time ball; and sites...
-
Non-destructive Diagnostics of the Floor in the Gdańsk Crane Using Ground Penetrating Radar = Diagnostyka nieniszcząca posadzki w gdańskim Żurawiu z zastosowaniem metody georadarowej
PublicationThis paper presents the results of a ground penetrating radar (GPR) survey carried out at the Crane in Gdańsk. The measurements were conducted on the floor of the southern and northern towers. The aim of the experiment is to assess the possibility of detecting anomalies beneath the floor. The surveys were carried out in a non-destructive manner, using a georadar unit with 2 GHz and 400/900 MHz antennas. This paper compares the...
-
Technical monitoring system for a new part of Gdańsk Deepwater Container Terminal
PublicationDevelopment strategy for the port of Gdańsk assumes that , up to 2027, it will become the main transport centre in the Baltic Sea region. To this end , for many years work has been carried out to facilitate access to the port both by sea and land. One of the elements of extension of the port is the building of another terminal of Deepwater Container Terminal , Gdańsk. In this task, geotechnical operations aimed at appropriate...
-
Simulation-Based Approach to a More Efficient Handling Strategy for a Container Terminal Storage Yard: Case Study of the Baltic Hub Container Terminal
PublicationThe primary objective of this research was to implement a more efficient handling strategy in the container terminal storage yard at the Baltic Hub Container Terminal (BHCT). Following an analysis of the current logistics system associated with starboard-side mooring, an attempt was made to shift the mooring to the port side. Two routing strategies corresponding to the analysed mooring operations were tested using a developed model....
-
Simulation-Based Approach to a More Efficient Handling Strategy for a Container Terminal Storage Yard: Case Study of the Baltic Hub Container Terminal
PublicationThe primary objective of this research was to implement a more efficient handling strategy in the container terminal storage yard at the Baltic Hub Container Terminal (BHCT). Following an analysis of the current logistics system associated with starboard-side mooring, an attempt was made to shift the mooring to the port side. Two routing strategies corresponding to the analysed mooring operations were tested using a developed...