Filters
total: 2580
filtered: 353
-
Catalog
Chosen catalog filters
Search results for: critical micelle concentration
-
de mininis state aid for entrepreneurs in EU law
Open Research DataThis dataset will provide basic information on the legislation regarding the de minimis state aid under EU law, and some literature explaining the nature and effects of the de minimis state aid for entrepreneurs in some EU Member States in the budgetary period 2014-2020. As this kind of state aid admissible under the GBER, the individual decisions of...
-
Dynamic impedance data for various carboxylic acids corrosion inhibition of aluminium in alkaline media (pH=11)
Open Research DataThis dataset contains the results of Dynamic Electrochemical Impedance Spectroscopy (DEIS) carried out in galvanostatic mode under iDC=0, carried out in order to define the corrosion inhibition effect of various studied carboxylic acids: citric acid, malic acid, maleic acid, succinic acid, tartaric acid, carballylic acid, and serine. The experiment...
-
Structure of ammonium vanadate synthesis by LPE-IonEx method
Open Research DataThe DataSet contains the XRD patterns, FTIR spectra of NH4VO3 crystals with different morphology obtained by the LPE-IonEx method.
-
Thermogravimetric analysis data of hydration in air and nitrogen for BaCe0.6Zr0.2Y0.1M0.1O3-δ (M = Fe, Pr, Tb)
Open Research DataThe dataset consists of 6 files of thermogravimetric analysis (TGA) data. The TGA experiments of hydration for BaCe0.6Zr0.2Y0.1Fe0.1O3-δ (BCZYFe), BaCe0.6Zr0.2Y0.1Pr0.1O3-δ (BCZYPr), and BaCe0.6Zr0.2Y0.1Tb0.1O3-δ (BCZYTb) were conducted on Netzsch STA 449.
-
Testing of DES toxicity towards Candida subhashii
Open Research DataDataset presents results of testing toxicity of selected DES solutions in mineral salt medium towards Candida subhashii.
-
FTIR spectra and IGC chromatograms for chemically reduced graphene oxide aerogels (rGOA)
Open Research DataThe effect of selected synthesis parameters on reduced graphene oxide aerogels properties was investigated using Fourier-transform infrared spectroscopy and dynamic adsorption method (Inverse Gas Chromatography, IGC). Samples were synthesized by sol-gel method by reduction induced self-assembly of graphene oxide. As a reductant l-ascorbic acid was used....
-
X-ray Photoelectron Spectroscopy studies of various carboxylic acids adsorption on aluminium alloys in alkaline media
Open Research DataThis dataset contains the results of high-resolution XPS studies obtained during evaluation of high corrosion inhibition efficiency of various carboxylic acids towards aluminium alloy 5754 in bicarbonate buffer pH=11.
-
The electrochemical response to glassy carbon electrode modification steps towards viral electrochemical immunosensor preparation
Open Research DataThe dataset contains the electrochemical measurements (CV/EIS) carried out for the consecutive steps of the glassy carbon GC electrode functionalization, in separate subfolders, as described. The cyclic voltammetry (CV) was conducted using a Palmsens 4 potentiostat/galvanostat system (Methrom, Autolab, Netherlands) in the standard three-electrode configuration,...
-
Chromium FTW dataset
Open Research DataThis dataset contains the results of chromium and nutrients (N and PO4-P) removal in floating treatment wetland microcosm experiment with two cosmopolitan species of parennials: Phragmites australis and Iris pseudacorus.
-
The luminescence study of LiGa5(1−x)O8:5xCr3+ coumpounds
Open Research DataInfrared luminescent materials have evoked much attention from chemists and material scientists. Although substantial progress is made in materials design, the luminescent mechanism remains ambiguous in the complex structures, presenting major barriers to developing novel infrared luminescent materials. Herein, this study aims to deliberate a complete...
-
The impact of QDgreen, QDgreen−β−CD−FA, β−CD, C−2028, β−CD(C−2028), QDgreen−C−2028, and QDgreen−β−CD(C−2028)−FA nanoconjugates on lysosomal content in the cancer (H460, Du-145, LNCaP) and normal (MRC-5, PNT1A) cells
Open Research DataThe impact of QDgreen, QDgreen−β−CD−FA, β−CD, C−2028, β−CD(C−2028), QDgreen−C−2028, and QDgreen−β−CD(C−2028)−FA nanoconjugates on lysosomal content in the cancer (H460, Du-145, LNCaP) and normal (MRC-5, PNT1A) cells was performed by Confocal Laser Scanning Microscopy (63× magnification; ZEISS LSM T-PMT, Magdeburg, Germany). To explore the influence...
-
The changes of outlet gases concentrations from SOFC with Ce(Pr,Sm)O2-s layers
Open Research DataThe dataset includes The changes of outlet gases concentrations from SOFC with Ce(Pr,Sm)O2-s layers. Samples were produced using aqueous soft chemistry methods (microemulsion method) and applied in form of a layer onto the anode of the commercial SOFC. The SOFC was working under biogas feeding.
-
XRD patterns of TeOx-BaO-BiO powder
Open Research DataThe DataSet contains the XRD patterns of the TeOx-BaO-BiO powder. The material was obtained by the sol-gel method. The starting solution was prepared by mixing telluric acid (precursor), barium carbonate, and bismuth carbonate with thetraetylene glycol, water, ethanol, and acetic acid. (Samples molar concentration: 73TeO2-4BaO-3Bi2O3 and 73TeO2-3BaO-4Bi2O3)....
-
Evaluation of antimicrobial activity of porous composites based on chitosan/poly (vinyl alcohol)
Open Research DataThe dataset contains the results of microbiological tests of composite porous materials whose activity was assessed for their ability to reduce the number of Escherichia coli and Staphylococcus aureus strain, representing the Gram (-) and Gram (+) bacteria, respectively.
-
The luminescence study ofNaK2Li[Li3SiO4]4:Eu coumpounds.
Open Research DataNarrowband green phosphors with high quantum efficiency are required for backlighting white light-emitting diode (WLED) devices. Materials from the A[Li3SiO4]4:Eu2+ family have recently been proposed as having superior properties to industry-standard β-SiAlON green phosphors. Here, we show that a cheap, easily synthesized host NaK2Li[Li3SiO4]4 (NKLLSO)...
-
Analytical and reliability data from the real-time simulator biogas plant
Open Research DataThe dataset represents the results of biogas plant simulation. The described plant is an agricultural biogas system, which can produce electrical energy with power estimated up to 1070 kW and heat energy that can reach 1200 kW simultaneously.
-
Substrate characterization in a electrochemically derived Manganium-Cobaltium thin films
Open Research DataManganium-Cobaltium thin films were electrochemically deposited on a Ni foams subsrates in a one-step process at −1.1 V vs. Ag/AgCl in an aqueous solution of differently concentrated Mn(NO3)2·4H2O and Co(NO3)2·6H2O with the deposition time limited by charges of 60, 120, and 200 mC at 25 °C. The concentration ratios of Mn(NO3)2·4H2O to Co(NO3)2·6H2O...
-
Rain Gardens SW quality dataset
Open Research DataThis dataset contains the results of parameters of storm water runoff and storm water quality in rain garden units. Samples were collected from 4 different rain gardens in Gdansk, Poland.
-
Determination of flow properties of a serial connection of a directional control valve with (C=5.7, b=0.32) and a air blow gun from changes in air pressure in a tank being emptied
Open Research DataThe aim of the study was to determine the flow properties of serial connection of pneumatic components.The experiments were to measure the pressure changes in a being emptied tank for a directional control valve and a air blow gun (with nozzle removed) arranged in-line. Three test configurations were used: (1) being emptied tank -> DCV -> ambient...
-
Determination of flow properties of a serial connection of a directional control valve with (C=2.1, b=0.14) and a air blow gun from changes in air pressure in a tank being emptied
Open Research DataThe aim of the study was to determine the flow properties of serial connection of pneumatic components.The experiments were to measure the pressure changes in a being emptied tank for a directional control valve and a air blow gun (with nozzle removed) arranged in-line. Three test configurations were used: (1) being emptied tank -> DCV -> ambient...
-
Determination of flow properties of a serial connection of a pressure relief valve with (C=7.3, b=0.49) and a air blow gun from changes in air pressure in a tank being emptied
Open Research DataThe aim of the study was to determine the flow properties of serial connection of pneumatic components.The experiments were to measure the pressure changes in a being emptied tank for a pressure relief valve and a air blow gun (with nozzle removed) arranged in-line. Three test configurations were used: (1) being emptied tank -> PRV -> ambient...
-
Determination of flow properties of a serial connection of a directional control valve with (C=2.8, b=0.25) and a air blow gun from changes in air pressure in a tank being emptied
Open Research DataThe aim of the study was to determine the flow properties of serial connection of pneumatic components.The experiments were to measure the pressure changes in a being emptied tank for a directional control valve and a air blow gun (with nozzle removed) arranged in-line. Three test configurations were used: (1) being emptied tank -> DCV -> ambient...
-
Determination of flow properties of a serial connection of a directional control valve with (C=5.5, b=0.37) and a air blow gun from changes in air pressure in a tank being emptied
Open Research DataThe aim of the study was to determine the flow properties of serial connection of pneumatic components.The experiments were to measure the pressure changes in a being emptied tank for a directional control valve and a air blow gun (with nozzle removed) arranged in-line. Three test configurations were used: (1) being emptied tank -> DCV -> ambient...
-
Determination of flow properties of a serial connection of a pressure relief valve with (C=6.4, b=0.45) and a air blow gun from changes in air pressure in a tank being emptied
Open Research DataThe aim of the study was to determine the flow properties of serial connection of pneumatic components.The experiments were to measure the pressure changes in a being emptied tank for a pressure relief valve and a air blow gun (with nozzle removed) arranged in-line. Three test configurations were used: (1) being emptied tank -> PRV -> ambient...
-
Determination of flow properties of a serial connection of a pressure relief valve with (C=6.2, b=0.38) and a air blow gun from changes in air pressure in a tank being emptied
Open Research DataThe aim of the study was to determine the flow properties of serial connection of pneumatic components.The experiments were to measure the pressure changes in a being emptied tank for a pressure relief valve and a air blow gun (with nozzle removed) arranged in-line. Three test configurations were used: (1) being emptied tank -> PRV -> ambient...
-
Determination of flow properties of a serial connection of a directional control valve with (C=2.4, b=0.26) and a air blow gun from changes in air pressure in a tank being emptied
Open Research DataThe aim of the study was to determine the flow properties of serial connection of pneumatic components.The experiments were to measure the pressure changes in a being emptied tank for a directional control valve and a air blow gun (with nozzle removed) arranged in-line. Three test configurations were used: (1) being emptied tank -> DCV -> ambient...
-
Determination of flow properties of a serial connection of a pressure relief valve with (C=3.3, b=0.40) and a air blow gun from changes in air pressure in a tank being emptied
Open Research DataThe aim of the study was to determine the flow properties of serial connection of pneumatic components.The experiments were to measure the pressure changes in a being emptied tank for a pressure relief valve and a air blow gun (with nozzle removed) arranged in-line. Three test configurations were used: (1) being emptied tank -> PRV -> ambient...
-
Determination of flow properties of a serial connection of a directional control valve with (C=2.0, b=0.11) and a air blow gun from changes in air pressure in a tank being emptied
Open Research DataThe aim of the study was to determine the flow properties of serial connection of pneumatic components.The experiments were to measure the pressure changes in a being emptied tank for a directional control valve and a air blow gun (with nozzle removed) arranged in-line. Three test configurations were used: (1) being emptied tank -> DCV -> ambient...
-
Determination of flow properties of a parallel connection of two pneumatic elements with (C=6.40, b=0.45) and (C=6.00, b=0.25) from changes in air pressure in a tank being emptied
Open Research DataThe aim of the study was to determine the flow properties of parallel connection of pneumatic components.The experiments were to measure the pressure changes in a being emptied tank for a pressure relief valve and a air blow gun (with nozzle removed) arranged in parallel. Three test configurations were used: (1) being emptied tank -> PRV -> ambient...
-
Determination of flow properties of a parallel connection of two pneumatic elements with (C=2.10, b=0.14) and (C=6.40, b=0.45) from changes in air pressure in a tank being emptied
Open Research DataThe aim of the study was to determine the flow properties of parallel connection of pneumatic components.The experiments were to measure the pressure changes in a being emptied tank for a directional control valve and a pressure relief valve arranged in parallel. Three test configurations were used: (1) being emptied tank -> DCV -> ambient atmosphere,...
-
Determination of flow properties of a parallel connection of two pneumatic elements with (C=2.80, b=0.25) and (C=6.40, b=0.45) from changes in air pressure in a tank being emptied
Open Research DataThe aim of the study was to determine the flow properties of parallel connection of pneumatic components.The experiments were to measure the pressure changes in a being emptied tank for a directional control valve and a pressure relief valve arranged in parallel. Three test configurations were used: (1) being emptied tank -> DCV -> ambient atmosphere,...
-
Determination of flow properties of a parallel connection of two pneumatic elements with (C=3.30, b=0.40) and (C=6.00, b=0.25) from changes in air pressure in a tank being emptied
Open Research DataThe aim of the study was to determine the flow properties of parallel connection of pneumatic components.The experiments were to measure the pressure changes in a being emptied tank for a pressure relief valve and a air blow gun (with nozzle removed) arranged in parallel. Three test configurations were used: (1) being emptied tank -> PRV -> ambient...
-
Determination of flow properties of a parallel connection of two pneumatic elements with (C=5.70, b=0.32) and (C=6.20, b=0.38) from changes in air pressure in a tank being emptied
Open Research DataThe aim of the study was to determine the flow properties of parallel connection of pneumatic components.The experiments were to measure the pressure changes in a being emptied tank for a directional control valve and a pressure relief valve arranged in parallel. Three test configurations were used: (1) being emptied tank -> DCV -> ambient atmosphere,...
-
Determination of flow properties of a parallel connection of two pneumatic elements with (C=2.10, b=0.14) and (C=7.30, b=0.49) from changes in air pressure in a tank being emptied
Open Research DataThe aim of the study was to determine the flow properties of parallel connection of pneumatic components.The experiments were to measure the pressure changes in a being emptied tank for a directional control valve and a pressure relief valve arranged in parallel. Three test configurations were used: (1) being emptied tank -> DCV -> ambient atmosphere,...
-
Determination of flow properties of a parallel connection of two pneumatic elements with (C=2.40, b=0.26) and (C=2.10, b=0.14) from changes in air pressure in a tank being emptied
Open Research DataThe aim of the study was to determine the flow properties of parallel connection of pneumatic components.The experiments were to measure the pressure changes in a being emptied tank for two directional control valves arranged in parallel. Three test configurations were used: (1) being emptied tank -> the first DCV -> ambient atmosphere, (2) being...
-
Determination of flow properties of a parallel connection of two pneumatic elements with (C=5.50, b=0.37) and (C=6.40, b=0.45) from changes in air pressure in a tank being emptied
Open Research DataThe aim of the study was to determine the flow properties of parallel connection of pneumatic components.The experiments were to measure the pressure changes in a being emptied tank for a directional control valve and a pressure relief valve arranged in parallel. Three test configurations were used: (1) being emptied tank -> DCV -> ambient atmosphere,...
-
Determination of flow properties of a parallel connection of two pneumatic elements with (C=5.70, b=0.32) and (C=6.40, b=0.45) from changes in air pressure in a tank being emptied
Open Research DataThe aim of the study was to determine the flow properties of parallel connection of pneumatic components.The experiments were to measure the pressure changes in a being emptied tank for a directional control valve and a pressure relief valve arranged in parallel. Three test configurations were used: (1) being emptied tank -> DCV -> ambient atmosphere,...
-
Determination of flow properties of a parallel connection of two pneumatic elements with (C=2.80, b=0.25) and (C=3.30, b=0.40) from changes in air pressure in a tank being emptied
Open Research DataThe aim of the study was to determine the flow properties of parallel connection of pneumatic components.The experiments were to measure the pressure changes in a being emptied tank for a directional control valve and a pressure relief valve arranged in parallel. Three test configurations were used: (1) being emptied tank -> DCV -> ambient atmosphere,...
-
Determination of flow properties of a parallel connection of two pneumatic elements with (C=2.80, b=0.25) and (C=2.00, b=0.11) from changes in air pressure in a tank being emptied
Open Research DataThe aim of the study was to determine the flow properties of parallel connection of pneumatic components.The experiments were to measure the pressure changes in a being emptied tank for two directional control valves arranged in parallel. Three test configurations were used: (1) being emptied tank -> the first DCV -> ambient atmosphere, (2) being...
-
Determination of flow properties of a parallel connection of two pneumatic elements with (C=2.00, b=0.11) and (C=6.20, b=0.38) from changes in air pressure in a tank being emptied
Open Research DataThe aim of the study was to determine the flow properties of parallel connection of pneumatic components.The experiments were to measure the pressure changes in a being emptied tank for a directional control valve and a pressure relief valve arranged in parallel. Three test configurations were used: (1) being emptied tank -> DCV -> ambient atmosphere,...
-
Determination of flow properties of a parallel connection of two pneumatic elements with (C=2.00, b=0.11) and (C=7.30, b=0.49) from changes in air pressure in a tank being emptied
Open Research DataThe aim of the study was to determine the flow properties of parallel connection of pneumatic components.The experiments were to measure the pressure changes in a being emptied tank for a directional control valve and a pressure relief valve arranged in parallel. Three test configurations were used: (1) being emptied tank -> DCV -> ambient atmosphere,...
-
Determination of flow properties of a parallel connection of two pneumatic elements with (C=2.40, b=0.26) and (C=2.80, b=0.25) from changes in air pressure in a tank being emptied
Open Research DataThe aim of the study was to determine the flow properties of parallel connection of pneumatic components.The experiments were to measure the pressure changes in a being emptied tank for two directional control valves arranged in parallel. Three test configurations were used: (1) being emptied tank -> the first DCV -> ambient atmosphere, (2) being...
-
Determination of flow properties of a parallel connection of two pneumatic elements with (C=7.30, b=0.49) and (C=6.00, b=0.25) from changes in air pressure in a tank being emptied
Open Research DataThe aim of the study was to determine the flow properties of parallel connection of pneumatic components.The experiments were to measure the pressure changes in a being emptied tank for a pressure relief valve and a air blow gun (with nozzle removed) arranged in parallel. Three test configurations were used: (1) being emptied tank -> PRV -> ambient...
-
Determination of flow properties of a parallel connection of two pneumatic elements with (C=3.30, b=0.40) and (C=6.40, b=0.45) from changes in air pressure in a tank being emptied
Open Research DataThe aim of the study was to determine the flow properties of parallel connection of pneumatic components.The experiments were to measure the pressure changes in a being emptied tank for two pressure relief valves arranged in parallel. Three test configurations were used: (1) being emptied tank -> the first PRV -> ambient atmosphere, (2) being...
-
Determination of flow properties of a parallel connection of two pneumatic elements with (C=5.50, b=0.37) and (C=6.00, b=0.25) from changes in air pressure in a tank being emptied
Open Research DataThe aim of the study was to determine the flow properties of parallel connection of pneumatic components.The experiments were to measure the pressure changes in a being emptied tank for a directional control valve and a air blow gun (with nozzle removed) arranged in parallel. Three test configurations were used: (1) being emptied tank -> DCV ->...
-
Determination of flow properties of a parallel connection of two pneumatic elements with (C=2.40, b=0.26) and (C=2.00, b=0.11) from changes in air pressure in a tank being emptied
Open Research DataThe aim of the study was to determine the flow properties of parallel connection of pneumatic components.The experiments were to measure the pressure changes in a being emptied tank for two directional control valves arranged in parallel. Three test configurations were used: (1) being emptied tank -> the first DCV -> ambient atmosphere, (2) being...
-
Determination of flow properties of a parallel connection of two pneumatic elements with (C=6.40, b=0.45) and (C=7.30, b=0.49) from changes in air pressure in a tank being emptied
Open Research DataThe aim of the study was to determine the flow properties of parallel connection of pneumatic components.The experiments were to measure the pressure changes in a being emptied tank for two pressure relief valves arranged in parallel. Three test configurations were used: (1) being emptied tank -> the first PRV -> ambient atmosphere, (2) being...
-
Determination of flow properties of a parallel connection of two pneumatic elements with (C=3.30, b=0.40) and (C=6.20, b=0.38) from changes in air pressure in a tank being emptied
Open Research DataThe aim of the study was to determine the flow properties of parallel connection of pneumatic components.The experiments were to measure the pressure changes in a being emptied tank for two pressure relief valves arranged in parallel. Three test configurations were used: (1) being emptied tank -> the first PRV -> ambient atmosphere, (2) being...
-
Determination of flow properties of a parallel connection of two pneumatic elements with (C=2.80, b=0.25) and (C=5.70, b=0.32) from changes in air pressure in a tank being emptied
Open Research DataThe aim of the study was to determine the flow properties of parallel connection of pneumatic components.The experiments were to measure the pressure changes in a being emptied tank for two directional control valves arranged in parallel. Three test configurations were used: (1) being emptied tank -> the first DCV -> ambient atmosphere, (2) being...
-
Determination of flow properties of a parallel connection of two pneumatic elements with (C=5.50, b=0.37) and (C=6.20, b=0.38) from changes in air pressure in a tank being emptied
Open Research DataThe aim of the study was to determine the flow properties of parallel connection of pneumatic components.The experiments were to measure the pressure changes in a being emptied tank for a directional control valve and a pressure relief valve arranged in parallel. Three test configurations were used: (1) being emptied tank -> DCV -> ambient atmosphere,...