Filters
total: 2479
filtered: 34
-
Catalog
- Publications 1993 available results
- Journals 7 available results
- People 68 available results
- Inventions 16 available results
- Projects 34 available results
- Laboratories 3 available results
- Research Teams 6 available results
- Research Equipment 2 available results
- e-Learning Courses 177 available results
- Events 13 available results
- Open Research Data 160 available results
Chosen catalog filters
Search results for: UBYTKI SŁUCHU WYWOŁANE HAŁASEM
-
Contactless conveying of light objects utilizing Poisson's phenomenon and squeeze film acoustic levitation
ProjectsProject realized in Faculty of Mechanical Engineering according to UMO-2016/23/B/ST8/00210 agreement from 2017-07-10
-
Wrażliwość skorelowanych układów kropek kwantowych na zewnętrzne pole magnetyczne wywołana oddziaływaniem z otoczeniem
ProjectsProject realized in Faculty of Applied Physics and Mathematics according to UMO-2011/01/B/ST2/05459 agreement from 2011-12-12
-
PLAN-B The path towards addressing adverse impacts of light and noise pollution on terrestrial biodiversity and ecosystems
ProjectsProject realized in Department of Urban Architecture and Waterscapes according to Project 101135308 — PLAN-B agreement from 2023-10-22
-
Influence of plate position on the first metatarsophalangeal joint arthrodesis
ProjectsProject realized in Katedra Wytrzymałości Materiałów from 2021-10-01
-
Hybrid energy storage devices based on composite materials for high power application
ProjectsProject realized in Department of Chemical Apparatus and Theory of Machines according to POWROTY/2017-4/15 agreement from 2018-05-10
-
Heat transfer and pressure drop during condensation in minichannels of new refrigeration fluids at the parameters close to thermodynamic critical point
ProjectsProject realized in Faculty of Mechanical Engineering according to UMO-2021/41/N/ST8/04421 agreement
-
GOS_CeA The influence of galacto-oligosaccharides via the microbiome-gut-brain axis on behavioural, endocrine and immune response and neurochemical processes in rats with induced hyperactivity of the amygdala
ProjectsProject realized in Wydział Biologii according to 2019/35/N/NZ4/00908 agreement from 2020-07-08
-
ROSANNE ROlling resistance, Skid resistance, ANd Noise Emission measurement standards for road surfaces
ProjectsProject realized in Faculty of Mechanical Engineering according to 605368 agreement from 2013-10-18
-
ELANORE Improvement of the EU tyre labelling system for noise and rolling resistance
ProjectsProject realized in Department of Machine Design and Vehicles according to NOR/POLNOR/ELANORE/0001/2019-00 agreement from 2020-09-10
-
DESTINATE "Decision supporting tools for implementation of cost-efficient railway noise abatement measures”
ProjectsProject realized in Poznan University of Technology according to 730829 agreement from 2016-11-01
-
Probabilistic analysis of the mechanical response variation of a tensegrity dome due to geometric and loading imperfections, with an estimation of the dome's sensitivity and operational reliability in terms of ultimate and serviceability limit states
ProjectsProject realized in Structural Mechanics Department
-
OT3-3A/PG Devices for road safety
ProjectsProject realized in Structural Mechanics Department according to DZP/RID-I-67/13/NCBR/2016 agreement from 2016-02-26
-
FLOW Furthering Less Congestion by creating Opportunities for more Walking and cycling
ProjectsProject realized in Department of Transportation Engineering according to 635998 agreement from 2015-04-14
-
FLOW Furthering Less Congestion by creating Opportunities for more Walking and cycling
ProjectsProject realized in Department of Transportation Engineering according to 331826/PnH/2016 agreement from 2016-11-28
-
EuroSAP-NWRSA European Road Safety Partnership - Network Wide Road Safety Assessment
ProjectsProject realized in Department of Transportation Engineering
-
MINIATURA 6 Empirical research on the impact of the type of rail vehicle and railway surface on noise in the Tricity Agglomeration
ProjectsProject realized in Gdańsk University of Technology according to 554881 agreement from 2022-01-13
-
Empirical research on the impact of the type of rail vehicle and railway surface on noise in the Tricity Agglomeration
ProjectsProject realized in Department of Transportation Engineering
-
RID 3D The impact of advertising on the level of road safety
ProjectsProject realized in Department of Transportation Engineering according to DZP/RID-I-33/4/NCBR/2016 agreement from 2016-02-26
-
Nowoczesne metody obliczania przepustowości i oceny warunków ruchu dla dróg poza aglomeracjami miejskimi, w tym dla dróg szybkiego ruchu
ProjectsProject realized in Faculty of Civil and Environmental Engineering according to DZP/RID-I-50/9/NCBR/2016 agreement from 2016-02-26
-
HAWIM Highly Accurate Wieigh in Motion system
ProjectsProject realized in Department of Transportation Engineering
-
EuroS@P European Road Safety Partnership
ProjectsProject realized in Department of Transportation Engineering according to 2020-1-PL01-KA203-081964 agreement
-
n/d Investigation of traffic effects on flexible pavements reinforced by geocomposites
ProjectsProject realized in Department of Transportation Engineering according to PPN_BEK_2020_1_00289 agreement from 2021-05-15
-
RID 4D Wpływ stosowania usług Inteligentnych Systemów Transportowych na poziom bezpieczeństwa ruchu drogowego
Projects -
OT4-4B/AGH-IET-PG-ETI-WSTKT Selection of acceptable transport speeds on roads, taking account of dynamic traffic management
ProjectsProject realized in Department of Multimedia Systems according to DZP/RID-I-68/14/NCBR/2016 agreement from 2016-03-17
-
Kinezyna w ruchu względem tubuliny - właściwości wody solwatacyjnej i oddziaływania pomiędzy białkami
ProjectsProject realized in Department of Physical Chemistry according to UMO-2013/09/D/NZ1/01087 agreement from 2014-02-10
-
RID 3C Efficiency of "2+1" road cross-section considering different resolutions of lane separators
ProjectsProject realized in Department of Transportation Engineering according to DZP/RID-I-55/10/NCBR/2016 agreement from 2016-02-26
-
Wpływ czasu i warunków eksploatacyjnych na trwałość i funkcjonalność elementów bezpieczeństwa ruchu drogowego
ProjectsProject realized in Department of Transportation Engineering according to DZP/RID-I-64/12/NCBR/2016 agreement from 2016-02-26
-
ZSM Logistyka i technologie monitoringu oraz sposoby ochrony środowiska przed rozpoczęciem prac, w trakcie wiercenia, w procesach szczelinowania hydraulicznego oraz na etapie eksploatacji, w tym monitoringu wód podziemnych, powietrza, hałasu, gleby, emisji
ProjectsProject realized in Faculty of Chemistry according to BG1/ZSM/13 agreement from 2013-11-14
-
The influence of tram traffic on the rail wear increasing in time and heavy metal emissions around the tram route.
ProjectsProject realized in Department of Transportation Engineering according to DEC-2023/07/X/ST8/00005 agreement from 2023-05-15
-
Analysis of the level of safety and conditions of bicycle traffic on the basis of data collected by sensors located in the bicycle.
ProjectsProject realized in Department of Transportation Engineering
-
InfraNoise A system for precise monitoring of the impact of railway traffic on the environment, taking into account information on operational, technical and environmental data
ProjectsProject realized in Department of Transportation Engineering according to BRIK2/0020/2022-00 agreement from 2022-10-27
-
AQPs In search of new markers of male fertility in cattle. Aquaporins expression in the reproductive organs and sperm of the bulls (Bos taurus)
ProjectsProject realized in Faculty of Biotechnology and Animal Husbandry according to 2021/43/B/NZ9/00204 agreement from 2022-06-27
-
GreenerFlow Towards greener traffic flow in the South Baltic Region: a data-driven approach to the congestion problem
ProjectsProject realized in Department of Transportation Engineering
-
MENA-SAFE Master Curriculum, Capacity Building and Network Development in Traffic Safety in Egypt, Jordan and Lebanon
ProjectsProject realized in Faculty of Civil and Environmental Engineering according to 2015-3172/001 - 001 agreement from 2015-12-22